ShonTron
Moderator
Member Bio
- Joined
- Apr 24, 2007
- Messages
- 12,647
- Reaction score
- 9,836
- Location
- Ward 13 - Toronto Centre
A numbered company, through Kirkor Architects and GWD planning consultants, has submitted a pre-consultation for a land assembly at Railroad Street and Mill Street North, across from the GO Station in Downtown Brampton.
Three towers: 54, 52, 50 stories, replacing eight houses and an auto repair shop, but one residential property, 52 Mill St N, is not part of the assembly, making for an irregularly sized land assembly. There are options in case the developer is able to acquire that house, which admittedly, is a well-maintained property, unlike most of the rest.
So far, looks like a zoning/massing exercise for now than a complete proposal, but one worth watching.
Three towers: 54, 52, 50 stories, replacing eight houses and an auto repair shop, but one residential property, 52 Mill St N, is not part of the assembly, making for an irregularly sized land assembly. There are options in case the developer is able to acquire that house, which admittedly, is a well-maintained property, unlike most of the rest.
So far, looks like a zoning/massing exercise for now than a complete proposal, but one worth watching.