News   Aug 16, 2024
 1K     0 
News   Aug 16, 2024
 637     0 
News   Aug 16, 2024
 522     0 

Search results

  1. R

    Toronto U of T: Lash Miller Building Expansion | 25.03m | 4s | U of T | Mikkelsen Arkitekter

    Great pics! I love that UofT St. George has around 5 cranes up on site. I hope UofT continues this sort of momentum up with future projects.
  2. R

    Toronto 284 Lawrence West | 52.35m | 14s | First Capital | Turner Fleischer

    Interesting article stating that Pusateri's will consolidate all locations except the Avenue location. If this block is expected to be torn down, I don't know why they wouldn't keep the Bayview Village as their flagship. I'm not fully up to speed with this development site so maybe I'm missing...
  3. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    Fences are down! Grass looks really nice. Even the south lawn (originally fenced off) is open. Looks like a tiny bit of landscaping is left around the garage entrance
  4. R

    Toronto U of T: Myhal Centre for Engineering Innovation and Entrepreneurship | ?m | 8s | U of T | Montgomery Sisam

    I was actually in Bahen during the tragedy. As a UofT student, I can say there were more tragedies in Bahen after the one in 2019 that weren't heavily publicized. They added barriers to all the floors in Bahen shortly after the 3rd time... Unfortunately this doesn't solve the main problem of...
  5. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    around 6:00 pm today: so there were 2 private security cars blocking the road to the parking garage (stationed under the old bridge). Same with a private security car blocking access to kings college road from college. Not sure if construction is on going during the day
  6. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    The walkway adjacent to the garage entrance is coming along. However the roads leading into the area are blocked due to security so I'm not sure how much construction can progress these days
  7. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    Not sure if you're talking about recent events, but I think the lawn will be a bit damaged given what's going on right now....
  8. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    Lots of baby Cherry Blossom trees are blooming around the field!
  9. R

    Toronto Hurvitz Brain Sciences Centre at Sunnybrook Hospital | ?m | 2s | Sunnybrook Hospital | HDR

    April 15: exterior almost finished I was in a lab meeting last week, and I heard that they designed the building to support a 5-8 story addition. Makes sense if you look into the windows and see the massive concrete columns. Of course this would likely be 10 years into the future.
  10. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    From The Strand: "The geothermal field will also act as both a garage and a subterranean classroom, where engineering students can see the inner workings" . The covered window may just be a display for the pipes as you said, but there is definitely some sort of classroom or interactive space in...
  11. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    Here is a very quick walk through: Entering from North West entrance Looking towards North East entrance (car entrance) A look at the EV charging pads: Walking towards the elevator entrance (South East) It looks like these glass windows may be for the small lecture hall which is...
  12. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    Guys.. the parking garage is open! Just chatted with a worker, said it’s open to walk around in. I couldn’t go in as I was late for my class. I’ll probably check it out around 12:30pm today
  13. R

    Toronto U of T: Academic Wood Tower | 77m | 14s | U of T | Patkau

    I stumbled upon the crane operators instagram, he seems to post amazing views every day (https://www.instagram.com/canadian_cranes?igsh=MTFnMWFsNGJxNzBmbw==). In one of his clips, he said this crane is the tallest free standing crane in North America!
  14. R

    Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

    Will part 2 of the build connect the two towers like seen in the render? First photo is from Feb 7 viewing out of Princess Margaret cancer research tower
  15. R

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I recall seeing a PDF for Sunnybrook's master plan which involves adding a 6-8 story building on their current parking lot outside M-wing. All I can find now is just a photo of the proposed building on this site. Not sure if they'll retain parking at that location, but as a Sunnybrook employee...
  16. R

    Toronto Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    I spoke way too soon.. looks like they're going to do some more digging in the upcoming week for water main connection. Hope they aren't going to tear up a lot of road
  17. R

    Toronto Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    Just walked through Y&E, there are ZERO lane restrictions or sidewalk restrictions! Aside from the couple missing sidewalk pavers needed to be poured, it's pretty much back to 100%.
  18. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    I didn't show it, but there is a fire pit at the floor of the gazebo. It looks like a gas fire pit, but even if it's not I'm not sure if having a wooden structure over a fire pit would be safe
  19. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    I just wanted to point out some details of the Hart House plaza. The gazebo looks really nice, though the metal work around adjacent panels could be a bit cleaner. The wooden benches are something I haven't seen anywhere else really, they're quite beautiful. I believe UofT wanted to salvage...

Back
Top