Toronto U of T: Schwartz Reisman Innovation Centre (Phase 2) | ?m | 20s | U of T | Weiss/Manfredi

Demolition for Phase 2, the ~20 floor east building, is well underway.

PXL_20250623_175012995.jpg

PXL_20250623_175109321.jpg
 
Last edited by a moderator:
Toronto's newest parking lot

View attachment 677849
So Phase 2 connects to Phase 1 - through a shared podium right? Or it was by previous design documents. Does that mean all those precast panels will just be disposed of? Seems like they could've used a cheaper knockout panel on this side, understanding this is only an interim condition.
 
So Phase 2 connects to Phase 1 - through a shared podium right? Or it was by previous design documents. Does that mean all those precast panels will just be disposed of? Seems like they could've used a cheaper knockout panel on this side, understanding this is only an interim condition.
I've been wondering if they'll reuse the affected panels on the new building, cus yeah otherwise it seems like a waste
 
The above posts have all been moved from the Phase One thread, and we now have an early-stage DB file attached atop for Phase Two.