News   Dec 04, 2025
 590     0 
News   Dec 04, 2025
 981     2 
News   Dec 04, 2025
 595     0 

Search results

  1. A Torontonian Now

    Toronto Danforth Baptist Church Redevelopment | 28m | 8s | Assembly Corp | McCallum Sather

    November 27, the crane in the relative foreground is this one:
  2. A Torontonian Now

    Toronto The Pemberton | 215.79m | 68s | Pemberton | a—A

    From Yonge Street November 27:
  3. A Torontonian Now

    Toronto 21 Oakmount Road | 144.6m | 41s | Elysium | Teeple Architects

    If ever I change my handle again, it will be to Skprascher Enthusiast
  4. A Torontonian Now

    Toronto 21 Oakmount Road | 144.6m | 41s | Elysium | Teeple Architects

    Can we please, please, change how threads are named? I want to see every proposal as a percentage or multiple of Niagara Falls.
  5. A Torontonian Now

    Toronto Ontario Line: Cosburn Station | 8.75m | 1s | Metrolinx | HDR

    I tend to agree, with some caveats. @cranehunter123 is clearly trying to help, and as a collaborative community on the forum, his contribution of looking things up and pointing them out to the mods from a new perspective and with vigour has value. However, I find many of his posts (especially...
  6. A Torontonian Now

    Toronto Eglinton Line 5: Mount Pleasant Station | ?m | 1s | Metrolinx | NORR

    Until I (or any member of the public) can walk inside, is it truly complete?
  7. A Torontonian Now

    Kawartha Lakes The Moorings on Cameron Lake | ?m | 3s | TKG | Turner Fleischer

    Occupancy can start before completion at many condos.
  8. A Torontonian Now

    Markham The Markdale | ?m | 3s | JD Development Group

    The TPZs are still up in that photo. Without being on site, based just on the fact that a realtor is marketing units, I'm not convinced this is complete. Close to completion, sure, but not necessarily fully complete.
  9. A Torontonian Now

    Milton 7472 Fifth Line | 14.84m | 1s | Menkes | Turner Fleischer

    @cranehunter123, this aerial doesn't show completeness to the level we typically consider complete on UT. There is clearly some landscaping, paving, and site cleanup to go. Looks like some roofing may yet be outstanding as well.
  10. A Torontonian Now

    Mississauga Pinnacle Uptown: Gemma Condos | 120.3m | 35s | Pinnacle | Richmond Architects

    Usually, this change is made on UT based on photographic evidence. Just curious how you're determining completeness, and if visually, would be great if you could snap and post a shot.

Back
Top