  1. D

    Toronto Pinnacle Centre Condos | 161.84m | 55s | Pinnacle | P + S / IBI

    Not really I was just told by a contractor to start producing product again. I just talked to the Architect to see if there was any changes to my scope of work. He sending me new drawings.
  2. D

    Toronto Pinnacle Centre Condos | 161.84m | 55s | Pinnacle | P + S / IBI

    i just heard tower 4 is a go.
  3. D

    Toronto MaRS Centre Phase 2 | 112.77m | 20s | Alexandria | B+H

    PCL the GC on this project was saying late Aug or Sept
  4. D

    Toronto Living Shangri-La Toronto | 214.57m | 66s | Westbank | James Cheng

    It's actually cheap to build right now with all the contractors out there with little work and interest rate being so low (as long as you can't get a loan), plus these building are going to take 2-4 years to complete. So owners are looking at it saying its cheap to build and the resession...
  5. D

    Toronto Living Shangri-La Toronto | 214.57m | 66s | Westbank | James Cheng

    i'm going to get drawing for this project on Friday, so for now the job is still a go.
  6. D

    Toronto MaRS Centre Phase 2 | 112.77m | 20s | Alexandria | B+H

    I depends on how long the job will be on hold. Cranes are like cars they need to be ran every once and a while to keep them in shape. If they where to keep them on site they would need to send someone there everyweek to do upkeep.As for these cranes they are owned by the forming company the same...
  7. D

    Toronto M5V Condominiums | 118.87m | 35s | Lifetime | Core Architects

    I have been waiting for drawings for 3 months now, the former said it had to do with a redesign.
  8. D

    Toronto MaRS Centre Phase 2 | 112.77m | 20s | Alexandria | B+H

    I was told that they still plan on going ahead may a soon as sept. but that is all talk nothing confirmed. The major issue with this project was that the mech. engineer really messed up this project. They designed the systems too small which are on the second floors and had to redesign them...
  9. D

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    Check the latest post in alofts, i put an email in there I got from Buttcon. It was confrimed on monday at a site meeting.
  10. D

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    MarsB Pinnacle building d Alofts (500 front)
  11. D

    Toronto MaRS Centre Phase 2 | 112.77m | 20s | Alexandria | B+H

    another projects I'm working on on hold.
  12. D

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    Of coarse Talon would tell you that financing is solid. What do you expect them to say no our financing is week. Oh by the way to you want buy a condo.
  13. D

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    I'm not speculating, I'm just stating that know really know what's going on, even the people directly involved in the project.
  14. D

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    I have done about 40% of the building in TO, the concrete formers on this project are the same at RBC, Ritz and Mapleleafs Square .
  15. D

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    He also mentioned that he heard they might stop at ground or second but with them almost at the ground he said that he doubted that would happen and said that the 7th floor was more of chance. I really don't thin anybody knows, if it will go or if they will put it on hold. Everybody says that...
  16. D

    Mississauga Absolute World | 169.77m | 56s | Cityzen | MAD architects

    The reason that parking levels are going so slow is that there has been alot of changes to the pg. The reason is that the townhouses in the front where not selling because they where too big and pricey. So they redesigned them a bit smaller and will now have some retail.
  17. D

    Toronto Parade at Concord CityPlace | 127.4m | 44s | Concord Adex | P + S / IBI

    Beleive me I have worked on every cityplace building since 2000 and once they are done forming the pg this place will rise pretty fast. I expect the west building drawings in the next 2 months or so.
  18. D

    Toronto Rêve | ?m | 14s | Tridel | Wallman Architects

    No crane to come down just yet, the owner is just shopping around for a mortgage. He was saying that the previous mortgage holder raised his rates and it wasn't worth to build with these rates. I was told we should here in the next week or so. I keep you posted.