News   Jan 09, 2026
 396     0 
News   Jan 09, 2026
 1.6K     1 
News   Jan 09, 2026
 992     0 

Search results

  1. 4

    Toronto 1233 Queen East | 35.7m | 10s | Core Development | Studio JCI

    The link didn’t open. I believe this is being done by core developments but don’t see anything about it on their IG handle?
  2. 4

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Great pics but that additional space isn’t all for OL… there are currently only 2 tracks operational for GO/VIA on the eastern section of the rails and bridges and there will ultimately be 4 tracks for GO/VIA +2 for OL. What is being built right now is essentially the room for the additional +2...
  3. 4

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Agree and this is the dumbest topic ever. Who knows what life will be like when those few stops (they aren’t in a straight line) will support some Queen street traffic. We don’t know what we don’t know including whether the OL will even ever be completed. Next topic,
  4. 4

    Alto - High Speed Rail (Toronto-Quebec City)

    Can we debate Laval a little more? Please? Lol jeez. Next topic?
  5. 4

    Alto - High Speed Rail (Toronto-Quebec City)

    Yes but a project that turns out to be 3x more than estimated is either a lie or ineptitude at its highest order. We would all be fired for understating the cost of a project so egregiously that one can only surmise that it was lying or wilful negligence which is akin to lying.
  6. 4

    Alto - High Speed Rail (Toronto-Quebec City)

    Easier than Union by BILLIONS of dollars as demonstrated by inept Metrolinx who lied about the OL and said it would cost $9BN and here we are at over $27BN for a choo choo train that will run half of its journey outside at a cost of over a $BN per kilometre but somehow Alto is going to deliver...
  7. 4

    Alto - High Speed Rail (Toronto-Quebec City)

    It’s literally going to have to run nearly the entirety of the OL. Y’all act as if it’s not coming into Toronto lol
  8. 4

    Alto - High Speed Rail (Toronto-Quebec City)

    When half of it is NOT tunnelled and in fairly sparse areas - yes I can - especially when Alto will need to navigate a portion of the exact same route. When has the Gov not understated infrastructure projects? How are you surprised by the notion that it’s likely already understated by 50%...
  9. 4

    Alto - High Speed Rail (Toronto-Quebec City)

    Silly estimation. The cost of owning a car is 2-3x what it was 20 years and that’s not about to change
  10. 4

    Alto - High Speed Rail (Toronto-Quebec City)

    The $80-90BN budget is a dream. Metrolinx is going to spend $30BN on 15.8km of Ontario line. How will 900km+ cost only 3x more when they’ll literally need to build hundreds of bridges? Gotta love Gov estimates!!
  11. 4

    Alto - High Speed Rail (Toronto-Quebec City)

    Guys - it’s going to terminate at Summerhill and the LCBO becomes the station. Mark my words.
  12. 4

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    The good news about metrolinx’ latest failure on Finch is we may actually get to transit priority light systems like the rest of the world got in 1993. Woot woot!
  13. 4

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Let’s just all pray the OL will actually be operational soon. It needs to be operational before we can speculate on traffic patterns and make lasting decisions. In the meantime. Hope the city can kill off street parking on all streetcar routes and move on with things….
  14. 4

    Toronto 50 McGee | 16.51m | 4s | Bicycle Properties Group | Moote

    I really like it now that it’s done.
  15. 4

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Fair but an easier move would be extending the Bloor line from Kipling an extra 1.5km to service Sherway and the go electrification should bring Parklawn a stop on the lakeshore line while the OL could loop up dufferin or Jane to take pressure off those busy bus routes
  16. 4

    Toronto Biblio Lofts | 28.91m | 7s | NVSBLE | BDP Quadrangle

    Black aluminum trim on floor 2 and 3 looks good. Would be nice to also trim out or black stucco the concrete face of the terraces on floor 4 tho. They’re working hard to get this place done
  17. 4

    Toronto Ontario Line: Riverside-Leslieville Station | 15m | 2s | Metrolinx | HDR

    Hallejuliah! The northern sidewalk on Queen and De Grassi has reopened! It’s huuuuuge!
  18. 4

    GO Transit: Construction Projects (Metrolinx, various)

    Spoken like a city bureaucrat. There is zero plan for a transit connection that will operate prior to EH being stood up. Delivering on a road first is us repeating our car first problematic past.
  19. 4

    GO Transit: Construction Projects (Metrolinx, various)

    Would be great if the Broadview streetcar could loop across Commisioners and back to the city up Cherry street. The new Biidaasige park is already a busy area but we’ll wait until all the condos go in before anything gets done

Back
Top