News   Dec 20, 2024
 958     5 
News   Dec 20, 2024
 737     2 
News   Dec 20, 2024
 1.2K     0 

Search results

  1. ctf5650

    Toronto Concord Sky | 299m | 85s | Concord Adex | Kohn Pedersen Fox

    Wait... will the south wall have no windows in it for the entire height of the building? Or is this just for the lower levels near the podium
  2. ctf5650

    TTC Cartography, Signage, and Wayfinding

    The direction arrows, text font, icons such as the train symbol and (not pictured) accessibility, even the "6" roundel is in the Metrolinx-chosen font
  3. ctf5650

    TTC Cartography, Signage, and Wayfinding

    From videos and images released by Metrolinx and the press, it seems like Line 5 follows a different wayfinding standard than Line 6, with Line 6 seemingly using the Metrolinx design standard. Does anyone know the reason for this?
  4. ctf5650

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Shocking, it feels like a few weeks ago folks seemed hopeful for a potential Q1 opening and now October is coming up in discussions (as an extreme of course but still crazy)

Back
Top