News   Dec 20, 2024
 1.3K     7 
News   Dec 20, 2024
 939     2 
News   Dec 20, 2024
 1.8K     0 

Search results

  1. U

    Toronto Pearson International Airport

    Yes, but they would be mindful of the Air France flight in 2005 that over shot the runway. https://en.wikipedia.org/wiki/Air_France_Flight_358 Pilots practice the touch-and-go procedure when qualifying, it should be routine.
  2. U

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    and then on to the Woodbine Go station
  3. U

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    The cross over to allow LRVs to turn back towards Yonge is located between Science Centre and Aga Khan stations. Is it possible that vehicles turning back would pass through SC, navigate the cross over, and stop at AK so the driver can change ends using a platform?
  4. U

    GO Transit: Service thread (including extensions)

    I gather aircraft crew members were paid triple-time to work on NYE at small airlines.
  5. U

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Barrie line trains only. Possibly only the trains that start south of Allandale and make all-stops.
  6. U

    Halton Hills McGibbon on Main | ?m | 10s | Amico | Arcadis

    The caisson rigs have sat around doing nothing since Lperry noted their arrival but this week they finally started constructing the basement level 😁
  7. U

    Richmond Hill Yonge Line 1 North Subway Extension | ?m | ?s | Metrolinx

    Is this the first time Bouygues and Acciona have bid on work in Toronto? There's so much work in process that more and more of the major international contractors are getting involved.
  8. U

    Hamilton Hamilton Line B LRT | ?m | ?s | Metrolinx

    Since 2013, City of Hamilton has enforced a moratorium on cutting any of its roads for 5 years after reconstruction - good asset management. As the LRT work involves full reconstruction of the streets it touches, this will have triggered the need to replace a lot of old infrastructure in that's...
  9. U

    General railway discussions

    Another narrow gauge railway on Vancouver Island worth a visit is: https://www.albernipacificrailway.ca/ The tourist railway only operates to a historic mill site but tracks still appear to exist right through the Alberni valley over almost to the east coast railway.
  10. U

    GO Transit: Construction Projects (Metrolinx, various)

    It's going to be interesting to see the results of Metrolinx's 2051 Strategic Transit Plan that they've out sourced to HDR Inc. https://www.metrolinx.merx.com/public/solicitations/2556160462/abstract?origin=0 https://www.hdrinc.com/ca/markets/transportation/transit In her report for the 30-Nov...
  11. U

    Ontario Northland/Northern Ontario Transportation

    The One Web LEO satellites cover high latitudes (their service was initially only available at latitudes higher than 50 degrees). They offer 120Mb/s per antenna service with latency below 100ms. Icomera is engaged in a pilot to bring 5G service to UK trains in locations without 5G towers by...
  12. U

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    There's a Metrolinx Board Meeting on Thu 30-Nov. No doubt the Board members will get an update, in camera, and *perhaps* we who pay their salaries will hear something. :rolleyes:
  13. U

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Once Commissioner's Street (the orange bridge) is finished, and traffic is transferred there, excavation will begin to sever Villiers Street. The construction along HWAC's lower cyan line will look something like this:
  14. U

    TTC: Other Items (catch all)

    Time to implement "lane rental" for the tracks - the asset owner specifies a cost per hour for closing a km of track in the tendered docs, then each bidder includes that cost in their bid price based on the time they'd need to complete their work plan. This encourages innovative work methods...
  15. U

    Hamilton Hamilton Line B LRT | ?m | ?s | Metrolinx

    Anyone know whether a light rail vehicle could climb 10% gradient that's about 650m long? Wikipedia states that the maximum gradient for friction-based rail is 10% after that a rack-cog system is needed: https://en.wikipedia.org/wiki/Rack_railway
  16. U

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    From the Wayfinding drawings. This would be the Ontario Line station building.
  17. U

    General railway discussions

    I guess this was prompted by the possibility of a new container port at SE of Mulgrave @ Middle Melford, NS. CBC - Strait of Canso container terminal There's another similar proposal beside Sydney, NS but this one has an active railway close-by, whereas Sydney would require a lot of work to get...
  18. U

    GO Transit: Service thread (including extensions)

    I'd suggest you start with your Member of Provincial Parliament's office. Or, if they aren't of the same party as the current provincial government, the nearest OPC MPP.
  19. U

    GO Transit: Service thread (including extensions)

    In case we were wondering which country's processes are being copied by the OnCorr contractor (Onxpress), check out the wording of this job ad on linkedIn: Onxpress Train Access Mgr It includes: "the aim of increasing network capacity and improving performance for Freightliner services"...
  20. U

    GO Transit: Construction Projects (Metrolinx, various)

    Onxpress will need to fill their job vacancy for a Train Service Design Manager: linkedIn Ad 1 and Train Service Planning Specialist: linkedIn Ad 2 to achieve this.

Back
Top