News   Dec 20, 2024
 599     4 
News   Dec 20, 2024
 536     2 
News   Dec 20, 2024
 705     0 

Search results

  1. Allandale25

    VIA Rail

    And, maybe even see some maps.
  2. Allandale25

    VIA Rail

    ^ I believe he said it would partially come from existing housing-related programs he would cut (many of INFC’s housing funds ie Housing Accelerator Fund, Canada Housing Infrastructure Fund, etc.). So a direct connection to HFR at this point isn't being made.
  3. Allandale25

    GO Transit: Construction Projects (Metrolinx, various)

    Someone posted this in the More Transit for Southern Ontario discord channel.
  4. Allandale25

    Brampton Transit/Zum

    ^ two pics from the City's post on this. @Wm Perkins Bull who is it named after? (Sorry to see it wasn't you).
  5. Allandale25

    Brampton Cadetta Johnston Transit Facility | 14.14m | 2s | City of Brampton | Architecture 49

    ^ two pics from the City's post on this. @Wm Perkins Bull who is it named after? (Sorry to see it wasn't you).
  6. Allandale25

    Brampton Transit/Zum

    ^ Surprised I didn't see any social media coverage on it yet, or there wasn't a big ceremony with a lot of politicians. Didn't it get funding from the Province/Feds as well?
  7. Allandale25

    Brampton Cadetta Johnston Transit Facility | 14.14m | 2s | City of Brampton | Architecture 49

    ^ Surprised I didn't see any social media coverage on it yet, or there wasn't a big ceremony with a lot of politicians. Didn't it get funding from the Province/Feds as well?
  8. Allandale25

    VIA Rail

    https://www.railfans.ca/news/editorial-cns-speed-restrictions-on-via-rail-a-tactical-pressure-move
  9. Allandale25

    GO Transit: Construction Projects (Metrolinx, various)

    ^ sorry you're right I missed that. You win the prize for first switch installation picture posted here and @vistaway wins for first switch installation with full ballast picture posted here. Fair?
  10. Allandale25

    GO Transit: Construction Projects (Metrolinx, various)

    ^ this appears to be the first photo confirm here the switch has now been installed.
  11. Allandale25

    VIA Rail

    @smallspy @crs1026 is there any sense of what it would cost to add the shunt enhancement solution to the Venture sets? $10 million? How long would it take?
  12. Allandale25

    VIA Rail

  13. Allandale25

    Caledon-Vaughan GO Rail Line

    They made a typo where the second "Go" should have been "GO".
  14. Allandale25

    GO Transit: Construction Projects (Metrolinx, various)

    https://pub-brampton.escribemeetings.com/Meeting.aspx?Id=2728fece-1b1e-439a-9846-bc8eb203fca0&lang=English&Agenda=Merged&Item=51&Tab=attachments While this correspondence is about the proposed Downtown Brampton Transit Hub terminal location, interestingly it shows the "PROPOSED GO STATION...
  15. Allandale25

    GO Transit: Service thread (including extensions)

    Here's the Metrolinx post with the timings of the new trains. Notes adjustments for other trains on other lines. https://www.metrolinx.com/en/news/more-rush-hour-service-coming-to-milton-line?utm_campaign=mxnews&utm_medium=social&utm_source=facebook,twitter
  16. Allandale25

    Toronto 175 Cummer | 10.49m | 3s | City of Toronto | Montgomery Sisam

    ^ Look forward to seeing the construction pictures and the associated river of NIMBY tears.
  17. Allandale25

    GO Transit: Service thread (including extensions)

    Not sure if this is new news.
  18. Allandale25

    VIA Rail

    Nothing really new in this column for those following the issue here. But it does have this passage which again has already been posted here. https://nationalpost.com/opinion/via-rail-gets-slower
  19. Allandale25

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    ^ So they didn't include the TTC on the latest version?

Back
Top