News   Nov 27, 2024
 750     4 
News   Nov 27, 2024
 656     1 
News   Nov 27, 2024
 1K     1 

Search results

  1. H

    Danforth Line 2 Scarborough Subway Extension

    TTC annual 10 cents fare increase will certainly bring us over.
  2. H

    GO Transit: Construction Projects (Metrolinx, various)

    https://www.metrolinxengage.com/sites/default/files/BAR%2520Roll%2520Plans%2520Combined.pdf I don't really know what's the point of this track?
  3. H

    GO Transit: Construction Projects (Metrolinx, various)

    Considering that the Midland layover and Eglinton Turnaround Track is less than 1 km, Metrolinx might just as well connect them together. *The 4th track*
  4. H

    GO Transit: Construction Projects (Metrolinx, various)

    It's not new for the Eglinton turnback track, though the midland layover as part of the Scarborough junction grade separation is new. No one in the Feb open house can answer me why the Eglinton layover is needed for some reason. All the numbers are shifted by 1 due to the new layover at Walkers...
  5. H

    GO Transit: Construction Projects (Metrolinx, various)

    https://www.metrolinxengage.com/en/goexpansion/oncorridor Round 2 Virtual Open House from August 18 - September 1
  6. H

    Metrolinx: Other Items (catch all)

    Service does not cost more in Toronto. It's just that the majority of the TTC budget comes from fare revenue while the 905 is government subsidy from taxes. In fact, it cost more for 905 to run the transit system. Therefore during COVID, the TTC loss more revenue per rider than the 905.
  7. H

    GO Transit: Service thread (including extensions)

    I meant a separate route, not an extension of route 94
  8. H

    GO Transit: Service thread (including extensions)

    Go Transit should also have a route to Toronto Premium Outlet.
  9. H

    GO Transit: Service thread (including extensions)

    I am talking about the pdf schedule. GO Transit is looking into that, said on Twitter.
  10. H

    GO Transit: Service thread (including extensions)

    I am just saying it would be better in my opinion to have 45 between hwy 407 and square one, and another separate route from hwy 407 to unionville, so that the overall frequency stays the same and I don't need to wait 15 mins for the next bus in order to get a cheaper fare.
  11. H

    GO Transit: Service thread (including extensions)

    If the routes are separated at hwy 407 station, you don't need to wait 5 mins for the Presto card no double-tapping restriction.
  12. H

    York Region Transit: Viva service thread

    All GO shuttle will be cancelled from September 8.
  13. H

    GO Transit: Service thread (including extensions)

    45 extending to Unionville is terrible actually since GO Transit gives a transfer credit for transferring. $11.19 direct vs $6.40 westbound and $7.40 eastbound.transfer Also, GO Transit seems to post some incorrect schedule like route 40 the schedule only has an hourly service.
  14. H

    York Region Transit: Viva service thread

    https://www.yrt.ca/en/schedules-and-maps/service-changes.aspx York Region Service Change September 6, 2020 Comparing to pre-COVID, the following routes will have service increase: VIVA Orange 1 - Highway 7 2 - Milliken 8 - Kennedy 9 - 9th Line 16 - 16th Avenue 20 - Jane 24 - Woodbine 25 -...
  15. H

    407 Transitway

    https://407transitway.com/brantToHurontario/EPR.html The 407 transitway Environmental Project Report between Brant and Hurontario has been completed and can be view from the link above.
  16. H

    GO Transit: Construction Projects (Metrolinx, various)

    Here it is for the design of Woodbine GO station.
  17. H

    GO Transit: Construction Projects (Metrolinx, various)

    Metrolinx has also thought of running a mix of UP express and UP local to Pearson, according to this star article.
  18. H

    GO Transit: Construction Projects (Metrolinx, various)

    If I remember correctly, and from Steve Munro, Metrolinx changed the design of Liberty Village to two side platforms, with local tracks outside and express tracks inside.
  19. H

    GO Transit: Construction Projects (Metrolinx, various)

    I don't think there's additional space for another platform at Bloor, unless they build a new platform at another grade/level.
  20. H

    GO Transit: Construction Projects (Metrolinx, various)

    Where do you know Metrolinx is persuing express pair and local pair, rather than quad-tracked line?

Back
Top