News   Nov 22, 2024
 655     1 
News   Nov 22, 2024
 1.2K     5 
News   Nov 22, 2024
 3.1K     8 

Search results

  1. cplchanb

    TTC: Other Items (catch all)

    can they not have a slow order to broadview or are the trains sliding at 10km/h?
  2. cplchanb

    VIA Rail

    hope theres going to be more than just 1 big white via logo on the 5 car set...
  3. cplchanb

    VIA Rail

    Maybe a mistake and they're lining it up for a repaint of the lower panels? Or it could be a special one off?
  4. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    hoping that this latest software patch is the final one...
  5. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    with the resumption of LRT testing along the line does anyone know if thats because the latest software patch has been applied and/or the track has been fully repaired?
  6. cplchanb

    VIA Rail

    so we are finally halfway into the delivery schedule. so from the looks of its around 2 sets a month now? any rumblings on if they will exercise the option order?
  7. cplchanb

    GO Transit: Construction Projects (Metrolinx, various)

    apparently its because freight train double stackers and autocars may be wider than the platform. hence why even the wheelchair ramp platform is set so far back as well. honestly though i call BS on this for the lakeshore lines and any platforms on GO operated lines. theyre just being lazy on...
  8. cplchanb

    GO Transit: Construction Projects (Metrolinx, various)

    yup... its a cop out for bad design or too lazy to address the problem. add heating cables, get a salter or enclose it... but no theyll just lock it up because its the cheapest solution.
  9. cplchanb

    Metrolinx: Other Items (catch all)

    they just needed a second option to compare against their preferred BRT option. they will for sure go with BRT
  10. cplchanb

    GO Transit: Construction Projects (Metrolinx, various)

    so when will they double track Kennedy to the SJ? thats the real missing link for the stoufville line.
  11. cplchanb

    VIA Rail

    second render with pods for sure will be much different. no leg room and they need to have full height dividers or else that poor carryon bag will end up under the front row.
  12. cplchanb

    GO Transit Electrification | Metrolinx

    if they are building for a future with more frequent shorter trains than yes. its a tremendous waste of taxpayers dollars to build something for only 10% usage over accommodating a situation that comes only 10% of the time.
  13. cplchanb

    GO Transit Electrification | Metrolinx

    because ML doesnt have the brainpower to think ahead of what they WILL need vs what the current needs are. same with TTC and their new order of trams that still have trolley poles in an all panto line... its all a copy/paste exercise for their spec, yet they still manage to take 4x as longer...
  14. cplchanb

    TTC: Other Items (catch all)

    The slimy ATU 113 president was on newstalk 1010 this morning... when asked about what they want he just said job security pay and benefits... when asked to elaborate just complained that ttc was outsourcing their jobs and that 12000 members were in danger... what a crock of shit. if hes going...
  15. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Yea there were several sections that were a couple mm off
  16. cplchanb

    Quebec-Windsor Corridor

    ill be taking 668 and 669 in june on wed and sun respectively... hopefully by then there will be more ventures in service.
  17. cplchanb

    Finch West Line 6 LRT

    so it looks like the entire line for the most part is complete and ready to go pending final testing and training of operators.... far cry from the debacle that is line 5.
  18. cplchanb

    GO Transit Fleet Equipment and other

    Inb4 the leafs suffer another first round exit
  19. cplchanb

    VIA Rail

    yup they beat out Bbr as well. iirc it was between them, bbr and CRRC
  20. cplchanb

    Finch West Line 6 LRT

    well what part of the 0.84% is non essential to the opening of the line such as landscaping and minor deficiency work?

Back
Top