News   Nov 22, 2024
 638     1 
News   Nov 22, 2024
 1.1K     5 
News   Nov 22, 2024
 3K     8 

Search results

  1. cplchanb

    VIA Rail

    That's the biggest problem for vias operations. It thinks as if it's an airline and operates that way...
  2. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    So does this mean they are finally happy with their rail alignment and final commissioning can take place?
  3. cplchanb

    VIA Rail

    It's moronic how difficult it is for 2 transit agencies to work out together for trains departing max every 15 min and hourly, meanwhile places like Tokyo station with multiple operators, dozens of lines, local, rapid and limited express trains, departing every other minute, all with their own...
  4. cplchanb

    GO Transit Fleet Equipment and other

    The upper deck of these gallery cars look incredibly inefficient in terms of usage of space. That rack in the middle is a total waste of space
  5. cplchanb

    TTC: Other Items (catch all)

    They really did a dogs breakfast on this. Couldn't look less ugly or shoddy considering they had a decade to clean it up
  6. cplchanb

    TTC: Other Items (catch all)

    Yup.... the stairs will be destroyed by salt in 5 years time
  7. cplchanb

    VIA Rail

    The new train schedule has been updated. Anyone spot the new slots? https://www.viarail.ca/en/plan/new-fleet
  8. cplchanb

    VIA Rail

    I wonder when we will see the short and long consists that were proposed back in the design stage. Iirc they proposed 3 and 7 cars before the cab car as possible combinations
  9. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    also the very high turnover rate. My colleague has friends there that are on this project who have switched sides twice already. that in itself leads to a lot of confusion and backlog
  10. cplchanb

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Think about it though... how many people would go out of their way to stare into the Don valley specifically to look at a rail bridge. It's not like it's spanning the harbourfront to centre island. Most of the people who see it will be drivers on the dvp who have more things to worry about than...
  11. cplchanb

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    It's all about $$$ or value engineering. Precast concrete is much cheaper than steel. Not to mention they don't need repainting every 10 years and will not corrode unlike steel if left alone. People conveniently ignore the fact that these infrastructure pieces need to be maintained.
  12. cplchanb

    VIVA + York Region Transit

    well... 12c for adults 8c for children and nickel for seniors. could be worse....
  13. cplchanb

    VIA Rail

    When will the new venture schedule be updated? Last schedule was in April and a couple new sets should be online by now
  14. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    seems like they next train signs are now showing actual train info. saw the ones at Aga Khan station showing next 2 train etas
  15. cplchanb

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    i guess simply put, they dont know how to run their trains....
  16. cplchanb

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    Is this a design issue or just an unnecessary quirk in operations? overseas you got high speed trains routinely blazing through at 300km/h in same high platform situations with no issues.
  17. cplchanb

    TTC: Other Items (catch all)

    theres only so much TTC can do against people who are dumb and dont deserve to drive...
  18. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    makes sense... then again that lady was talking to an individual worker on the line who probably doesnt know the full picture and was making assumptions...
  19. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    well.. if a full replacement has to occur that would mean more tearing up brand new concrete once more... still waiting for that 3 month notice...
  20. cplchanb

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    yea i dont think she even knows about this issue. she only came in last year and all these operation speeds were determined long before tory stepped down. what we need to do is raise awareness to her office so that her staff can bring it up to her.

Back
Top