News   Jul 12, 2024
 1.6K     0 
News   Jul 12, 2024
 1.2K     1 
News   Jul 12, 2024
 458     0 

Search results

  1. 1

    Toronto Ontario Line 3 | ?m | ?s

    Trees cannot be planted anywhere on the keyhole site. The station headhouse only takes up the south end. From the factum:
  2. 1

    2022 Municipal Election: Council Races

    Scarborough Centre is no longer in "Scarborough Centre"?
  3. 1

    Toronto Ontario Line: Osgoode Station | ?m | ?s | Metrolinx | HDR

    It will not improve the Line 1-OL connection. There aren't a lot of options to connect two intersecting centre platforms.
  4. 1

    Ontario Line Extension West of Ontario Place (Speculation)

    The long ramps/stairs are there because pedestrain cannot cross the tracks at some stations. There would be long ramps regardless of low floor or high floor vehicles. If it's at-grade, they aren't much longer than the usual ramps. 39 Avenue station: https://goo.gl/maps/JZ6S9Vnp2jkXmeqPA
  5. 1

    Toronto Ontario Line: Osgoode Station | ?m | ?s | Metrolinx | HDR

    At the end it wasn't really about the trees. Trees were the pawns. The whole thing snowballed to include dissatisfaction about the station design, Metrolinx' lack of transparency, and the government in general. Some are new, some have existed before this fiasco. They are valid reasons, but...
  6. 1

    Toronto Ontario Line 3 | ?m | ?s

    However, that makes more sense as a non-fare paid zone connection. I guess they can add another row of fare gates between that and whatever underground level of the west keyhole (Simcoe St. entrance) it's connected to.
  7. 1

    Toronto Ontario Line 3 | ?m | ?s

    The station diagram on Steve Munro's blog provides much needed insight. I can't call the design perfect, but it's doing the best with cards dealt. The design avoids the mess we have at Eglinton/Yonge by steering clear of the existing station box as much as possible. Line 1 - OL direct...
  8. 1

    Roads: Roundabouts

    On closer look, it looks to be a variant of a turbo roundabout, so probably not quite vanilla. The centre lane (the lane closest to the roundabout centre?) splits, but there is no need to switch over to the new centre lane unless someone is trying to do a 270 degrees turn back to Queen.
  9. 1

    Roads: Roundabouts

    From Hespeler northbound: The right lane goes through the roundabout and onto Hespeler, hence the straight arrow. The lane markings guide you to the Hespeler exit. You cannot/should not use it to get to Beaverdale as that would be a lane change within the roundabout. The left lane is for...
  10. 1

    Roads: Ontario/GTA Highways Discussion

    In that case, the right lane has to drop off, or else those coming off express will have to do three lane changes to exit Kennedy.
  11. 1

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    It would not be just travel time savings if it was put underground (or elevated). The entire line would be grade-separated with no in-median/street-running, so theoretically, they could redesign it to run high-floor metro trains.
  12. 1

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    ^ This would actually be a good place to have a radiant snow melting system. (for safety, environment, and comfort)
  13. 1

    Transit City Plan

    Such a shame the eastern part of crosstown wasn't elevated - especially when they will run a parallel local bus service anyways.
  14. 1

    TTC: Other Items (catch all)

    Where can they put the second exit for Dundas? Yonge/Gould ?
  15. 1

    Ontario Science Centre

    Similar to how Sudbury has Science North and Dynamic Earth (which Science North operates).
  16. 1

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    If Metrolinx really wants to assign numbers to all rail transit lines in the GTHA, then this could be line 10 (and line 8 for Hamilton's King St. LRT). The numbers aren't assigned to any other lines (yet), might as well use them.
  17. 1

    Toronto Yonge Sheppard Centre Renovations and Expansion | 123.13m | 35s | RioCan | BDP Quadrangle

    I woulnd't mind if it's a second floor terrace. In some case that may actually have advantage over roadside patios.
  18. 1

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    From the second photo, I like the clean layout of the next arrival display. Hopefully one day we will get those on GO platforms. Now they better fix those exit signs. They are flipped.
  19. 1

    Ontario Line Extension West of Ontario Place (Speculation)

    For the Dufferin option, they can probably do something similar to the Lakeshore East corridor. Starting from Exhibition: Dufferin/Queen Brockton (Dufferin/Dundas) Dundas West (<> line 2) "Junction" (Dundas/Dupont) Stockyard (replaces planned station on Kitchener line) Mount Dennis (<> line 5)...
  20. 1

    Toronto Ontario Line 3 | ?m | ?s

    Their asses are still in tact. The other unions were afraid the same of what happened with education support workers will happen to them. Endorsement was given based on the PCs "pro-construction" stance.

Back
Top