News   Feb 13, 2026
 942     2 
News   Feb 13, 2026
 2.7K     1 
News   Feb 13, 2026
 4.6K     0 

GO Transit Fleet Equipment and other

What about HEP? Run HEP off the prime mover?

If an F40PH and a GP 40 have 3000hp what makes the F59 superior with the same HP? They should all be able to run L10 consist? Why replace them with newer locomotives with the same HP?
1. Separate HEP as the existing F59 setup does
2. This would be more about having a cleaner engine than a more powerful one and if the battery thing goes through there may be QSK60s looking for something to do
 
What about HEP? Run HEP off the prime mover?

If an F40PH and a GP 40 have 3000hp what makes the F59 superior with the same HP? They should all be able to run L10 consist? Why replace them with newer locomotives with the same HP?
Wouldn’t GO mechanics be experienced on EMD 16-645E3 parts? They haven’t rostered any 645 powered locomotives since 1994. Although Metra has plans to retire the F40PHs which are the 150-172 series with 4 already sold off to a Rail training facility in Colorado iirc.
 
If an F40PH and a GP 40 have 3000hp what makes the F59 superior with the same HP? They should all be able to run L10 consist? Why replace them with newer locomotives with the same HP?

12 cylinders instead of 16, a more robust parts supply industry. Different more modern electrical controls. One parts inventory instead of two.

Going forward, there is lots of opportunity to add shorter trains as the enhanced headways are implemented. GO may not need every unit to handle 12 car consists.

I think the enthusiast side of the room may be overthinking (inventing?) all these alternatives. Only the people who have the spreadsheets on their screens will know what the decision criteria and most viable options are. We may hear the explanation from Property A, but applying their rationale to Property B may be a fool's errand. We mostly have to wait and enjoy the developments as they happen. For now, watching the F59 cores come back to life is what is in front of us.

- Paul
 
Hanging out in Lambton Yard

IMG_6668.jpeg
 
I'm surprised that a single blocked track results in two hours of delays for the entire network today. We have 24 tracks? For UP I understand that they would be down because they use the northern track the most.
 
From Discord. F59 repainted to new GO livery. Existing unit, not one of the trains from Metrolink (California).
View attachment 713647
is this a pure repaint job or did they also reengine to Tier 4? now when will the rest of the go locos let alone the coaches get brought up to date?
just watch Go get a new branding before they even finish updating their current fleet.
 
is this a pure repaint job or did they also reengine to Tier 4? now when will the rest of the go locos let alone the coaches get brought up to date?
just watch Go get a new branding before they even finish updating their current fleet.
There are no body modifications visible to indicate any additional cooling capability or exhaust aftertreatment that would be indicative of upgrading the locomotive to meet the higher Tiers. This is strictly a repaint

Dan
 

Back
Top