I had the B-D line following Eglinton - back when the Eglinton Line was planned to go up to STC (circa 2011). This would have been a 4km extension of B-D, to Kingston (Road, not City), along with a 2km extension of elevated Eglinton Line to Centennial. Then 3km branches to Malvern or UTSC...