News   Apr 17, 2026
 703     0 
News   Apr 17, 2026
 1.5K     6 
News   Apr 17, 2026
 664     0 

Search results

  1. W

    PM Mark Carney's Canada

    It's hard to argue this. I didn't think it could get worse than Trudeau but Prime Minister Brookfield is sure giving a run for the money.
  2. W

    Toronto Ontario Line 3 | Metrolinx

    The criteria of no work in the water (and no permanent structure in the water) likely came from environmental or hydrology. They probably wanted to improve the hydraulics of the channel by having no piers to obstruct the water (assuming the existing bridge will be replaced during this one's life...
  3. W

    PM Mark Carney's Canada

    We voted for it, so why expect prosperity.
  4. W

    Toronto Ontario Line 3 | Metrolinx

    There are two types of balanced Cantilever design - with precast and with cast-in-place. Typically, they need several miles of bridge before the precast is considered. Also, they prefer to lift the segments from below which requires a bit more access from below - which is harder in a valley...
  5. W

    Eglinton East LRT | Metrolinx

    Thanks, My quick math if this was done in 2012 or so. Eglinton Grade separated to STC = $2B (extra over Eglinton LRT). 8 km elevated extension from STC to Malvern and UTSC = $2B. ($250M/km). 4km B-D extension to Kingston Road. $3B ($750M/km). Total = $7B. what we did. B-D...
  6. W

    QEW - Mississauga/Credit River Project

    I was hoping to have a tunnel there - but I guess it would still be the same effect of not being opened.
  7. W

    Eglinton East LRT | Metrolinx

    I had the B-D line following Eglinton - back when the Eglinton Line was planned to go up to STC (circa 2011). This would have been a 4km extension of B-D, to Kingston (Road, not City), along with a 2km extension of elevated Eglinton Line to Centennial. Then 3km branches to Malvern or UTSC...
  8. W

    News from across Europe

    I think the same thing happened in Romania and in France. The EU doesn't like a leader and mysteriously they come up with charges against them. Hopefully Hungary can resist the EU authoritarianism.
  9. W

    News from across Europe

    I guess it's up to Robert Fico to be the voice of reason in Europe. Orban could only do it for so long before the never-ending EU propaganda against him would bear fruit.
  10. W

    Eglinton East LRT | Metrolinx

    First off, it's too embarrassing to close Eglinton from Laird to Kennedy to elevate it. What's done is done and that mistake must be lived with for a while. Maybe at some point in the distant future when there is more of a network (Ontario Line to Seneca, Sheppard Line to Scarborough, etc.)...
  11. W

    Eglinton East LRT | Metrolinx

    It goes back to the Finch West arguement. It was working the way it was designed - but as soon as it opened it was realized that this was not what was wanted. They looked at the data and said that 80% (I'm inventing this) of trips are local, so who cares about overall speed. All that matters...
  12. W

    Eglinton East LRT | Metrolinx

    Usually the option is short frequent trains vs. long infrequent ones. Here you seem to be wanting frequent large trains - all the cost of large infrastructure plus all the costs of frequent surface.
  13. W

    Eglinton East LRT | Metrolinx

    I'd vote 100% elevated. Burying 50% seems to just add a bunch of cost while still having several reliability and bottleneck problems.
  14. W

    Premier Doug Ford's Ontario

    I think there is some type of weird contest were voters say they don't care how corrupt or immoral the governments is, they will continue to support them. Currently, the federal Liberal voters are beating the Provincial PC voters 4 to 3 and neither side is ready to blink.
  15. W

    Sheppard Line 4 Subway Extension (Proposed)

    I thought MTO looked at this "Big Bold Idea" back in 2019 or so. That is, the tunnel from 427 to 404. I recall MTO estimate was $50B or so (based on construction costs at the time).
  16. W

    2025 NDP Federal Leadership Race

    Not sure I fully understand this.
  17. W

    Sheppard Line 4 Subway Extension (Proposed)

    The only project I am aware where the contractor had the full ability to decide whether to use cut0and-cover was the Canada Line. And they chose it - faster and cheaper. The publics biggest complaint about transit construction is the cost and duration. Yet is it still not considered. I...
  18. W

    PM Mark Carney's Canada

    As a federally regulated industry, they have to obey their ultimate masters. Life could become quite hard if they didn't do this.
  19. W

    2025 NDP Federal Leadership Race

    I think Mulcair was the best leader since Broadbent. Most articulate, best policies. Layton only won because of Adscam and the other Liberal corruption from the 90's and early 00's that were exposed. He just caught the wave of lefties who switched left wing parties, but not especially for...
  20. W

    Wyecroft Rd Extension & Bridge Project (Halton / Oakville / Burlington)

    It took me a bit to figure it out. There are two sets of bridges. The West set are done. Looks like at least 1 lift of approach paving is also done, but not yet on the bridge. The main crossing to the East as the EBL bridge finished (not paved) and the WBL close to ready for concrete pour.

Back
Top