News   Mar 27, 2026
 111     0 
News   Mar 27, 2026
 243     0 
News   Mar 26, 2026
 1.3K     2 

Recent content by WB62

  1. WB62

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    There’s one and it’s just a covered up staircase. I’ll grab a photo sometime over the next few days and show which entrance it’s connected to in the Bay Concourse
  2. WB62

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    This is the only unused platform staircase at Union, and it actually connects to an entrance in the Bay Concourse. I don’t even think it’s pre renovation, it just never opened for some reason
  3. WB62

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    Some of the combined platforms will have over 2x more entrances, the upcoming platform configuration really will revolutionise the station For example: Platform 8-9 in its current state has 8 staircases and 1 elevator. Platform 10-11 in its current state has 6 staircases and 2 elevators. When...
  4. WB62

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    If all goes to plan, one day this area should have a elevated PATH junction to CIBC Square South/bus terminal, Union Station east platforms, Backstage/CIBC north, Pinnacle and the future eastern PATH districts, hopefully with a street level entrance.
  5. WB62

    GO Transit Fleet Equipment and other

    Their updated official service targets are slightly more ambitious than what you’re predicting. 7.5 minute service will run all day on the UP Express, and during peak hours on LW, LE. 15 minute service will expand to: Burlington Bramalea Maple Unionville Oshawa 30 minute service will run to...
  6. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I personally don’t think the platforms look bad, a lot of major train stations have less grand, more utilitarian platforms outside the main canopy, and that’s what these new platforms are. All of the remaining Union platforms outside the main canopy will look similar to what’s being built in...
  7. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Added! You’re correct, it’s the only escalator involved in this project. Its purpose and placement is likely to help the uneven crowd distribution on the eastern platforms. This is the first entrance 20 coaches worth of people will have access to, and the distribution of riders on Lakeshore...
  8. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    The USEP project page on the city AIC page got updated with a bunch of new documents. Haven’t had a chance to browse through them yet, however I noticed the platform level and canopy designs are being modified, with updated plans to be released this month. Value engineering time? New...
  9. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I honestly prefer it to the uncovered windows, I think the view of the traffic from the unrenovated teamways looks so awful
  10. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I can’t remember where I got it or how accurate it is, but I heard the other Teamways (and all remaining platform entrances) will be renovated when the platforms are reconfigured. Would love to see the bay west Teamway integrated into the concourse better, there’s an incredible amount of dead...
  11. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Through the city archives I found this amazing photo from the late 20s, that shows what the train concourse looked like in the midst of the Great Depression, when maintenance couldn’t be carried out:
  12. WB62

    GO Transit: Construction Projects (Metrolinx, various)

    Customer platform* Glad metrolinx is blessing Grimsby station with such novel and bold ideas like this, truly a star in the industry
  13. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    To celebrate we can all look back at the first post mentioning the jersey barriers! Posted 7,442 messages ago on April 25th, 2018
  14. WB62

    GO Transit: Construction Projects (Metrolinx, various)

    This is a couple years old so I’m sure the design has changed since, but their plans are to reinstate a track where the abandoned one currently is, and connect it to the existing tracks on both sides.
  15. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Miniso is expanding into the massive unit (94) adjacent to their current location (95 & 96) in the Market. They’ll be one of the largest retailers here when this happens

Back
Top