News   Dec 05, 2025
 586     2 
News   Dec 05, 2025
 2K     4 
News   Dec 05, 2025
 441     0 

Search results

  1. WB62

    Toronto St Clair-Old Weston GO Station | 9.13m | 1s | City of Toronto | Hatch

    Full rendering of St. Clair-Old Weston: The 185 metre GO platform that will go unused is still being built, with platform canopies and an accessibility platform: The UP Express platform is longer than other stations, 4 car UP trains can use this station.
  2. WB62

    GO Transit: Construction Projects (Metrolinx, various)

    (Crossposting from the ALTO thread) If Urban is right, could this be a reason why theres such a lack of movement on the remaining ST line projects + re-engineering highland creek bridge?
  3. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I’m saying the wall doesn’t need to come down when the staircase is removed. It could be removed (if the wall isn’t load bearing), but it’s not required.
  4. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    It wouldn’t, the only part of the wall that needs to come down when the temporary market staircase needs to be removed are are the spots where the drywall goes from floor to ceiling. These spots are where doors used to be:
  5. WB62

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Routes through stations impacted by construction are marked by signs with an orange outline:
  6. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Honestly no idea beyond removing the doors between the VIA Concourse and the arcade hallway, but I’m sure theres something that could have happened to distribute everyone better
  7. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I totally get the dirty feeling the space gives off, I imagine the harsh direct lighting, the acoustics, and the dingy brown tiles contribute a lot to that. I find the whole VIA Concourse extremely under-utilised after VIA service ends (which is at like 6pm), the entire space empties out while...
  8. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Here’s the difference in lighting between the new TD lounge and the rest of the concourse. If the whole concourse was furnished and renovated like the TD alcove was, I don’t think I would have any problems with this space. Both photos completely unedited to keep the comparison fair
  9. WB62

    GO Transit: Construction Projects (Metrolinx, various)

    Yesterday the Metrolinx CEO posted a photo of the newest version of the integrated transit map: https://www.linkedin.com/posts/michael-lindsay-4545b873_morning-toronto-metrolinx-regional-network-activity-7400172392003690496-ofVn Some GO related things that changed from the last version: •...
  10. WB62

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Warmer lighting would nice too, look at the brand new TD Lounge in the VIA concourse, it has much nicer warmer toned LED lights and the difference is super noticeable. I’ll take a photo sometime tomorrow
  11. WB62

    Alto - High Speed Rail (Toronto-Quebec City)

    As far as I know (and my diagram uses a older platform reconfiguration design that might not necessarily be accurate anymore), most tracks were not going to move, tracks were going to be taken out and replaced with expanded platform space: I can’t imagine there would need to be any...
  12. WB62

    Alto - High Speed Rail (Toronto-Quebec City)

    The entire station remained open and functional when the shed was almost entirely taken apart for renovations.
  13. WB62

    Alto - High Speed Rail (Toronto-Quebec City)

    Someone at Metrolinx had this idea years ago and its obviously not gonna happen because it’s an insane one Even if it was actually feasible, idk how you expect the tracks to dip down, go back up, and then dip down again in 300 metres.
  14. WB62

    GO Transit: Construction Projects (Metrolinx, various)

    I’ve always wanted a proper visualisation of what this section would look like when it’s fully built out, but Metrolinx has never released renderings like that. it’s not the best I tried to do it myself:
  15. WB62

    GO Transit: Construction Projects (Metrolinx, various)

    You can see over the walls at East Harbour
  16. WB62

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The number of enthusiasts to the general public is 1 in a thousand. The goal of a transit agency is transit, not to cater to the 1% that cares a little more than the rest
  17. WB62

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Yes but this is also a place where other transit nerds can come and voice their opinions on stuff thats posted here. Identifying the above ground sections of Line 5 is an opinion I’ve seen a lot and I don’t agree with it. I don’t think the public cares if the line is above ground or whatever...
  18. WB62

    GO Transit: Service thread (including extensions)

    Some changes start on the 22nd, some on the 23rd.
  19. WB62

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    Rendering of the St. Clair-Old Weston platform: If this rendering is accurate, that high-floor platform is much longer than the current 80’ish metre long UP Express platforms. There isn’t enough existing equipment available to run 4 or more car UP Express trains, especially not at a higher...
  20. WB62

    Metrolinx: Other Items (catch all)

    Every announcement with the exception of the now arriving at automated announcement has to be triggered manually by the crew member onboard the train, it’s not location or line specific, if you’re consistently riding the same trips you’re likely just riding with someone that doesn’t set them...

Back
Top