Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Apr 24, 2026
From Timber to Low-Carbon Concrete, Materials Are Driving Sustainable Design
474
0
News
Apr 24, 2026
One Bloor West’s Wrap Coming Down as Crown Work Advances
888
0
News
Apr 24, 2026
40-Storeys Proposed at Future iON Stop in Cambridge
1.2K
3
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
legoswmonkey's latest activity
L
legoswmonkey
reacted to
Chris R.'s post
in the thread
Hamilton
188 Cannon Street East | 106.6m | 33s | Vantage | Arcadis
with
Like
.
I... Don't love that. Will be in contact with Ward 2 office to confirm and clarify whether there is a detour or provision for cyclists.
Feb 27, 2026
L
legoswmonkey
reacted to
JasonParis's post
in the thread
Toronto
Ontario Line 3 | Metrolinx
with
Like
.
It turned out to be a fairly low-key, non-media and non-political affair — but it was still a lot of fun. Here’s a photo of me basking...
Feb 27, 2026
L
legoswmonkey
reacted to
EnviroTO's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
I don't know why it isn't standard to have two elevators. One elevator is zero redundancy. I can understand Joe-Shmoh condo board...
Feb 27, 2026
L
legoswmonkey
replied to the thread
Hamilton
188 Cannon Street East | 106.6m | 33s | Vantage | Arcadis
.
Closure permit says until 2028, so 2 years. Seems like an absurdly long time though, and if bikes can't get through then there's almost...
Feb 26, 2026
L
legoswmonkey
reacted to
drum118's post
in the thread
Burlington
Paradigm Condominiums (Burlington) | ?m | 18s | Molinaro Group | Graziani + Corazza
with
Like
.
Feb 23 More up on my site Not sure what going on for broken links to my photos as its something new in the last few months as I never...
Feb 26, 2026
L
legoswmonkey
reacted to
drum118's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
Feb 23 Had my first look at Confederation Station since it open and a few surprise where to be seen. Parking lot was about 35-40% full...
Feb 25, 2026
L
legoswmonkey
reacted to
crs1026's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
I rode the Kitchener line yesterday and observed that there was work (of one sort or another ) in progress pretty much all the way from...
Feb 24, 2026
L
legoswmonkey
reacted to
Chris R.'s post
in the thread
Hamilton
Hamilton Line B LRT | ?m | ?s | Metrolinx
with
Like
.
With the existing LRT project expecting a completion of 2031-2033 I don't think an extension with a completion of 2034-2035 likely...
Feb 21, 2026
L
legoswmonkey
reacted to
reaperexpress's post
in the thread
GO Transit Fleet Equipment and other
with
Like
.
A diesel hybrid train would presumably save fuel for the same reason a Toyota Prius saves fuel even if you never plug it in. Most...
Feb 21, 2026
L
legoswmonkey
reacted to
kEiThZ's post
in the thread
Alto - High Speed Rail (Toronto-Quebec City)
with
Like
.
I want the Northern Route. To avoid NIMBYs, have a shorter route and to permanently rule out diversions to places like Kingston. And...
Feb 20, 2026
L
legoswmonkey
reacted to
Allandale25's post
in the thread
Alto - High Speed Rail (Toronto-Quebec City)
with
Like
.
Very detailed website here by some folks advocating for the Northern route. https://altohsrcitizenresearch.ca/ If you scroll down you...
Feb 18, 2026
L
legoswmonkey
reacted to
MisterF's post
in the thread
Alto - High Speed Rail (Toronto-Quebec City)
with
Like
.
I think Alto just hasn't finalized all the details yet and a lot of members of the forum are overthinking it.
Feb 17, 2026
L
legoswmonkey
reacted to
smallspy's post
in the thread
Alto - High Speed Rail (Toronto-Quebec City)
with
Like
.
We were told the same thing on Tuesday when I went. That was a particularly eye-opening statement, and certainly one at odds with the...
Feb 15, 2026
L
legoswmonkey
reacted to
APTA-2048's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
Noticed some actual progress in the LSE corridor past Danforth near Greenwood Yard. They have put down some ties and rails.
Feb 14, 2026
L
legoswmonkey
reacted to
Chris R.'s post
in the thread
Hamilton
Hamilton Line B LRT | ?m | ?s | Metrolinx
with
Like
.
I spoke to Metrolinx reps today at Winter Bike Day. They suggested three things: 1) Metrolinx was pleasantly surprised by the number of...
Feb 13, 2026
Members
Back
Top