    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    I might be wrong but in theory, couldn't they add these as infill stations if they really wanted? I remember reading that even though the stations were dropped, they made sure the tracks were level in the spots where the stations would have been.
  2. B

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The LED's for the extension were indeed installed from the beginning, just covered up till it opened
  3. B

    Toronto Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    I believe they made the curve radius tighter to save money thinking the trains would still be able to go at the ideal speed. Turned out doing so caused a lot of additional maintenance so the solution was to put a permanent slow zone
  4. B

    Toronto Pearson International Airport

    The same thing happened last summer. Probably has to do with capacity limitations at the main terminals during the summer season. More details from last year
  5. B

    Finch West Line 6 LRT

    They were running trains yesterday.
  6. B

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Didn't someone say they were already a year behind based on there current work along the GO corridor?
  7. B

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    So I'm honestly not exactly sure how accurate what I'm about to say is since this could simply be broken telephone but I've heard from someone (who was told this by a person working on the project) that there are 6 platforms with deficiencies where the train doors do not line up with the...
  8. B

    TTC: Major Operational Issues (Various)

    The southbound from Summerhill RSZ is still there weeks after they removed it from the map for some reason. The RSZ north from Bloor has been considerably shortened.
  9. B

    TTC: Other Items (catch all)

    IDK why they took it off but there is certainly still a RSZ southbound between Summerhill and Rosedale
  10. B

    Finch West Line 6 LRT

    Based on the Crosstown thread, sounds like the signal system has regressed.
  11. B

    TTC: Major Operational Issues (Various)

    21 RSZ’s on the tracks, 21 RSZ’s, take one down pass it around, now there’s 22 RSZ’s on the tracks. (Now there’s a RSZ southbound from Summerhill to Rosedale)
  12. B

    TTC: Major Operational Issues (Various)

    Aaaaaaand the slow zone NB between Lawrence West and Yorkdale is apparently back. Lasted 5 days...
  13. B

    TTC: Major Operational Issues (Various)

    As of yesterday, the Wellesley RSZ's still exist...
  14. B

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Honestly, since we know how the city has near non-existent coordination between projects, I'm willing to bet when they remove the bridge, the newly paved section will be ripped up or at least damaged.
  15. B

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Unrelated to the construction but interesting that the hydro pole is still leaning over after the flood. I wonder if Hydro even knows about it...