TTC: Easier Access Phase III

It's really mystifying. Honestly it's not hard to get relatively close matching coloured tiles, this is just pure lazy work and a lack of care to even try.
Yeah, Christie station was kind of awkward.
 
Guess we won't see the elevator open until the end of the week, as per Steve Munro:
The TTC has announced that construction at Greenwood Station will not clear the bus loop until February 13. Buses will continue to loop at Coxwell Station in the interim.
 
Guess we won't see the elevator open until the end of the week, as per Steve Munro:


I was there last week. They were still putting finishing touches on things and using the bus loop to park vehicles.
 
The corridor to the elevator to street level at Osgoode Station is blocked off with no explanation and no notice of alternatives. I just had to help carry an elderly woman’s walker up the stairs while she made her way up. Does anyone know why that corridor is blocked off? I hope it’s not for Ontario Line construction.
 
The corridor to the elevator to street level at Osgoode Station is blocked off with no explanation and no notice of alternatives. I just had to help carry an elderly woman’s walker up the stairs while she made her way up. Does anyone know why that corridor is blocked off? I hope it’s not for Ontario Line construction.

I believe the TTC website says it is due to icy conditons.

Perhaps it is falling ice?
 
I believe the TTC website says it is due to icy conditons.

Perhaps it is falling ice?
Forgot to reply to this last week. I wonder if it’s ice on the floor in that corridor. It gets frequently flooded with water seeping in from the ceiling and walls. Maybe it started freezing when it got cold enough.
 