I too am curious about scope.
Assuming "GO 1.0" remains substantially similar to the original promise in, what, 2015.. I would like to see the following in "GO 2.0":
1. Electrified, frequent service past Bramalea out to Kitchener using the recently announced CN "Bypass" track through Brampton
2. Electrified, frequent service on Milton
3. All-day service to Hamilton GO centre with a reconstruction of the Hunter St tunnel
4. electrified, frequent service through to Hamilton West Harbour (fixing Bayview Junction)
5. All-day service to Niagara, likely including the purchase of the CN Grimsby sub
7. Extension of 15-minute electrified service to Stouffville. Peak hour service to Uxbridge.
8. Bolton line - diesel all day service
9. Collingwood extension of GO service?
10. Cambridge extension SW from Guelph
Hmmm, of the above.....
1. Electrified, frequent service past Bramalea out to Kitchener using the recently announced CN "Bypass" track through Brampton
I would be satisifed by getting 15M service to Mt. Pleasant in that phase. Electrifying all the way to K-W has its appeal to be sure, but it would burn up a lot of money.
2. Electrified, frequent service on Milton
I think 2-way, all-day, 15M would be fine, and can be done conventionally. Again, I don't oppose electrification, but its a question of finite resources.
3. All-day service to Hamilton GO centre with a reconstruction of the Hunter St tunnel
4. electrified, frequent service through to Hamilton West Harbour (fixing Bayview Junction)
5. All-day service to Niagara, likely including the purchase of the CN Grimsby sub
The above I'm 100% behind, I would take them as a group and work through the lot.
7. Extension of 15-minute electrified service to Stouffville. Peak hour service to Uxbridge.
Sure, again, not stuck on electrification. Open to it. The only line I consider mandatory for it is LSW/LSE because I would like to see service ramped up to 10M or less frequency and shorter travel times, with infill stations, all of which taken together all but require electrification.
8. Bolton line - diesel all day service
9. Collingwood extension of GO service?
10. Cambridge extension SW from Guelph
These three I'm open to, but think are lower priority.
I would substitute:
8. GO Mid-town (Milton corridor to Agincourt or beyond.) I think this yields a better ROI.
9. Relocation/diversion of GO K-W corridor into Pearson to serve the airport directly with conventional GO.
10. Extension of Barrie, yes......but for now, I'm down with one additional stop near 400 or just west there of on the BCRY. Getting to Blue Mountain/Collingwood is a big jump and I'd be worried about encouraging sprawl.
11. Considering options to get GO closer to Clifton Hill. This could be a regional LRT from the existing station to said destination; but there are a few options on existing/former ROWs/Canal routes/hydro corridors that could get you much more into the heart of the Falls.
12. Re-alignment of a portion of the Barrie corridor between mid York region and Barrie if it could result in sufficient travel time savings. (Big if, but I haven't seen it modelled). I consider the existing travel time excessive) and I think that impedes the idea of extensions to Collingwood or Orillia when its already a long haul as it is.....