That explanation from the article makes sense "its been ready to go for awhile but Metrolinx is terrified of the Ottawa LRT debacle"

were we also talking about the 3-month board period. Maybe crosslinx or metrolinx wants a full 3-month demo before signing for completion.
So September? If thats true, why would TTC need another 3 months on-top of the revenue demonstration?
3 months of testing + additional 2 months of testing for good measure ?
 
I still say early 2026. If you're going to wait until autumn 2025, why not a little longer?
September does seem like the best time to open this line. A pseudo new year. End of summer break for some means many people are going back to the routine. Making the newly opened line part of the routine fits. Hope it isn't delayed more!
 
3 months of testing + additional 2 months of testing for good measure ?
Well, that happened here in Ottawa with Line 2, but part of it was regulatory paperwork. I doubt that's needed in the crosstown case. But OC Transpo still needed a month for a dress rehearsal with actual passengers, (non-driver) staff training, etc.
 
I still say early 2026. If you're going to wait until autumn 2025, why not a little longer?
Based on the crew scheduling, I don't see why it couldn't be the end of June.

But if September is the target, it would presumably be August 31 - as schools open early on September 2nd this year (Labour Day is September 1).

Which would be summer, not autumn. I'd think in general, opening something new at the beginning of September is better, and more natural, than early in the year.
 
Why? Does Yorkdale pay for its station? Scarborough Town Centre? Sherway for being called out on the bus destination signs? What about other institutions? York University?

Fairview Mall is a far more useful wayfinding marker than Parkway Forest. This isn't like downtown Toronto where there are other useful things around Queen and Dundas stations.

Of course, the simplest solution is not to rename the station at all. If, then Don Mills-Sheppard.
You don't need to sound confrontational if you disagree.
However, here are responses to your examples. Yorkdale's wasn't a name change. Scarborough Centre was not named after the mall (which is called Scaborough Town Centre). York University is right in the middle of it and more than likely built to serve the university.
 
Based on the crew scheduling, I don't see why it couldn't be the end of June.

But if September is the target, it would presumably be August 31 - as schools open early on September 2nd this year (Labour Day is September 1).

Which would be summer, not autumn. I'd think in general, opening something new at the beginning of September is better, and more natural, than early in the year.
I just hope they have the line technically ready to open by July, so that they can just "stall" for 2 months and work out any kinks that may pop up.
 
So, will there ever be a comprehensive explanation to the public of what went wrong? Obviously the persistent online rumors of unsolvable water problems were inaccurate, or the problems were solved.

More broadly, it feels like these projects have become too complex for their own good. Kind of reminds me of defense contracting, where designs for ships and planes etc are loaded up with so much theoretically useful tech that they become undeliverable, or impossible to maintain. The Yonge subway was designed and built with nothing more advanced than a slide rule, and has served the city very well for a long time.

Is there a case for radically simplifying how transit gets built?
 
You don't need to sound confrontational if you disagree
What was confrontational about that? You offered an opinion, I offered a counter opinion. If we wanted to extract money out of CF in the name of accurate wayfinding, it's fair do's to question why we don't do that for all other names that refer to institutions.

Yorkdale's wasn't a name change
How does this materially change the equation? If you have an objection to 'free advertising' this surely fits the bill, new name or no.

Scarborough Centre was not named after the mall (which is called Scaborough Town Centre)

Semantics. If you called the station Fairview instead of Fairview Mall, you'll get the same result.

York University is right in the middle of it and more than likely built to serve the university.
Don Mills, being right under Fairview Mall, is also not incidental to it.
 
In Metro Vancouver, under regional planning, Burnaby has two regional town centres called "Brentwood Town Centre" and "Lougheed Town Centre" , each of which is centred on a SkyTrain station bearing those names.
Each station also has an adjacent shopping mall.
Brentwood Mall had changed its name to Brentwood Town Centre following the 2002ish arrival of SkyTrain, but has now rebranded to "The Amazing Brentwood".
Lougheed Mall had also changed its name to Lougheed Town Centre (I think), but has now rebranded to "The City of Lougheed".
I suspect that the new names were chosen to avoid confusion with the broader regional planning names.
Both are owned by the same developer - Shape Properties.

Also in Burnaby, Eaton Centre Metrotown and Metrotown Centre (both adjacent to SkyTrain's Metrotown Station) were rebranded as "Metropolis at Metrotown" when the malls were combined under common ownership (Ivanhoe Cambridge), which retains the distinction for the Metrotown regional town centre.
 
Last edited:
What was confrontational about that? You offered an opinion, I offered a counter opinion. If we wanted to extract money out of CF in the name of accurate wayfinding, it's fair do's to question why we don't do that for all other names that refer to institutions.


How does this materially change the equation? If you have an objection to 'free advertising' this surely fits the bill, new name or no.



Semantics. If you called the station Fairview instead of Fairview Mall, you'll get the same result.


Don Mills, being right under Fairview Mall, is also not incidental to it.
Now is probably the time for the TTC/Metrolinx to come up with a naming policy that considers duplications. Just adding "West" or "North" might not cut it

Imagine if you had line 6 extend east. You'd have Don Mills, Don Mills North, and Don Mills Even more North 🤣

You could go the Chicago way and just embrace having multiple stations with the same name and add the cross street
 