Developer: University of Toronto
Architect: Mecanoo Architecten
  
Address: 6 Hoskin Ave, Toronto
Category: Residential (Student Dorm)
Status: ConstructionCrane(s): 1
Height: 54 ft / 16.52 mStoreys: 4 storeys
Project Forum 152 posts
Real Estate Forum
Follow 2 followingUpload 199 photos
Official WebsiteReport Error


Toronto U of T: Lawson Centre for Sustainability | 16.52m | 4s | U of T | Mecanoo Architecten

Very strange that they are starting the exterior finishing of the east wing but the west wing hasn’t even had its structure erected yet. Is there a logistics issue with the timber supplier?
 
Very strange that they are starting the exterior finishing of the east wing but the west wing hasn’t even had its structure erected yet. Is there a logistics issue with the timber supplier?
Looking at the above photos, I notice that the eastern elevator cores finished before the western cores, so it could be the way they are constructing this.

August 26, 2024:
20240826_094404.jpeg
 

Back
Top