Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

Oct 31
DJI_0035.JPG
DJI_0040.JPG
DJI_0042.JPG
DJI_0041.JPG
 
On Wed I shot the area around the 403 and no photo thanks to the camera chapping out and loosing the shot. Back to the repair shop.

They were turning on the construction lights for the eastbound 403 off ramp. The overpass median has been removed, but need to be pave over.

Don't know if the median for the Rathbun overpass is to be remove as that overpass was rebuilt about 10 years ago or is needed to shift traffic next year when the 403 overpass is rebuilt. It should be to shift traffic a lot easier .

Saw no signs of any pier support work that supposed to started back in June.

On my trip to Brampton on Friday, had a look at the corridor to Steeles. Other than land clearing on the northside of 407, saw no work in Brampton.

The southbound lanes north of the 401 has or in the process of new curbs pour.

At Bristol, they where paving the median now construction lights installed and working. They have over a block of paving to do.
 
Please post the link, not something with Outlook protection imbedded in, that leads to Microsoft's website - and creates security warnings. This is the link you posted:

na01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.metrolinxengage.com%2FHuLRT&data=04%7C01%7C%7C9183c47084d24aea949308d9a885999c%7C84df9e7fe9f640afb435aaaaaaaaaaaa%7C1%7C0%7C637726114041994821%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=oI6JUKbBj0x0S6sXL7N9j2Zg4vubER%2FFUCItlrFyLnM%3D&reserved=0

Rather than www.metrolinxengage.com/en/engagement-initiatives/hurontario-light-rail-transit-project
 
Please post the link, not something with Outlook protection imbedded in, that leads to Microsoft's website - and creates security warnings. This is the link you posted:

na01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.metrolinxengage.com%2FHuLRT&data=04%7C01%7C%7C9183c47084d24aea949308d9a885999c%7C84df9e7fe9f640afb435aaaaaaaaaaaa%7C1%7C0%7C637726114041994821%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=oI6JUKbBj0x0S6sXL7N9j2Zg4vubER%2FFUCItlrFyLnM%3D&reserved=0

Rather than www.metrolinxengage.com/en/engagement-initiatives/hurontario-light-rail-transit-project
That what was sent to me and had no issue with the link

 
If you use chrome or edge, typically it gets no warnings but firefox and safari are picky about these things
I got something on the project and it kill my mail account in most browsers that I have to reboot the system and still can't read it.
 
That what was sent to me and had no issue with the link

I think it's when you're copying the link from the email, rather than opening the link - and then copying it.
 
Took us 15 minutes to go from 403 to Eglinton yesterday as it went from 3 to one. It was setup being 2 lanes to one starting at the off ramp on our way home an hour later.

Only enough room for 4 cars to turn left going west on Eglinton causing some of the backup up issues as well a bitch for turning now and down the road. Southbound lanes set up for 2 lanes.

By the looks of things, the northbound lanes will be using the centre lanes as waterline work has started at Burnhamthrope Rd in the northbound lanes.

Starting Dec 6, foundation work will finally get underway for the pier support that were to take place in June,

Q1 will see construction start on the 403 and 407 overpass to rebuilt them as well expand the 407 ramps.

The median on the Rathburn Overpass will not be remove and expect some nice short distance shifting for the 403 work.

Have seen very little work south of Burnhamthrope Rd.

Construction on Rathburn last week prevented buses making a right turn onto City Centre that buses had to use Sq One roads to make turns.
 