Noticed today that new curbs and lane paving has taken place on the east side of Hurontario from the south side of Matheson to Britannia where construction took place. Looks like the curb is further to the east than before. Work going on the west side.
Once work is finish on the west side, the guide way work will get underway in, 2022 assuming no other underground work is require.
What is odd, is the removal of the medians for the sections leading up to the 403 overpass that still not pave after a few weeks. Part of the 403 median has been remove and pave which is still odd. 2022 will see the 403 overpass reduce to 4 lanes to allow the overpass to be rebuilt and that will be fun for drivers. I am assuming the areas that needs paving will be done once construction lights install and the rest of the bridge median is remove..
Otherwise, see no changes on Hurontario from Central Parkway to the 401.
Once work is finish on the west side, the guide way work will get underway in, 2022 assuming no other underground work is require.
What is odd, is the removal of the medians for the sections leading up to the 403 overpass that still not pave after a few weeks. Part of the 403 median has been remove and pave which is still odd. 2022 will see the 403 overpass reduce to 4 lanes to allow the overpass to be rebuilt and that will be fun for drivers. I am assuming the areas that needs paving will be done once construction lights install and the rest of the bridge median is remove..
Otherwise, see no changes on Hurontario from Central Parkway to the 401.