Toronto 321 Davenport | 36.4m | 9s | Alterra | Giannone Petricone

Curved glass! Curved glass! We already knew that I suppose, but that close-up rendering just brings it home. Dare I dream that's a polished concrete column?!

42
 
This stretch of Davenport is basically becoming all high-end mid-rise.

Now only if they could do something about that hideous gas station.
 
This stretch of Davenport is basically becoming all high-end mid-rise.

Now only if they could do something about that hideous gas station.

And more than mid-rise too, between AYC and the Designers Walk projects.

Sadly, I think the combination of the OMB rail corridor setback decision and the fact that the gas station site is contaminated has probably sterilized it for the foreseeable future, though it would indeed be lovely to see it go. I also cringe every time I go past the huge surface parking lot at the LCBO.
 
And more than mid-rise too, between AYC and the Designers Walk projects.

Sadly, I think the combination of the OMB rail corridor setback decision and the fact that the gas station site is contaminated has probably sterilized it for the foreseeable future, though it would indeed be lovely to see it go. I also cringe every time I go past the huge surface parking lot at the LCBO.

Without a doubt, the LCBO building + associated parking lot are cringeworthy.
 
The projected view from the 9th floor, facing south:



20210206_091030.jpg
 
New signage added to the presentation centre to indicate that construction is starting soon:



321dav.JPG
 
The presentation centre is permanently closing on December 23rd, 2021 as they prepare for construction. From Alterra's IG:



Screenshot_20211213-170010_Instagram.jpg
 