Toronto 1 Yorkville | 183.18m | 58s | Bazis | Rosario Varacalli

mmexport1508336352403.jpg
mmexport1508336356148.jpg
mmexport1508336359644.jpg
mmexport1508336361736.jpg
mmexport1508335372975.jpg
mmexport1508335377070.jpg
today。
 

Attachments

  • mmexport1508336352403.jpg
    mmexport1508336352403.jpg
    119.8 KB · Views: 583
  • mmexport1508336356148.jpg
    mmexport1508336356148.jpg
    123 KB · Views: 585
  • mmexport1508336359644.jpg
    mmexport1508336359644.jpg
    141.2 KB · Views: 592
  • mmexport1508336361736.jpg
    mmexport1508336361736.jpg
    202.6 KB · Views: 575
  • mmexport1508335372975.jpg
    mmexport1508335372975.jpg
    150.7 KB · Views: 571
  • mmexport1508335377070.jpg
    mmexport1508335377070.jpg
    101.1 KB · Views: 580
From across the street, I think these facades are going to look very "tacked on". But better that than losing them entirely.
 
nope, the interiors will be extensively renovated but the original wooden structure is going to remain. It is not a facade in any way.
 
I'm wondering if this is one of those buildings where we'll see a number of test pieces go up first because of its untested nature, then have to wait months for the settled-upon design to be manufactured.

Or maybe not, maybe it's all been figured out to their satisfaction already.

Either way, luckily we have plenty of other projects to distract us while we wait!

42
 
I believe we are on to regular floors now, no? Hopefully this starts to finally pick up some speed now.

As seen from last few photos by WillWu today, the FlyingTables are now being utilized! They seem to be starting Table-Form/Flying-Form (something TMG builder specialize in),... hence concrete forming should progress at about 1 floor every 1-1.5 weeks,.... thus, I would expect this project to top out in early-Spring 2019 and complete by around Summer-Fall 2019. And then Bazis will ride off into the sunset back to Kazakhstan.