Don't forget that GO's current 407 services are approaching crypto-BRT service levels already. There isn't going to be a magic big bang moment when the transitway comes into existence and ridership appears; rather, GO will keep adding service to the 407 until the ability to use the main freeway is maxed out and there's a need to switch to a grade-separated option, currently forecast for post-2021.I suppose. I agree that until the 407 BRT is in place, that station will likely see less than stellar ridership. However, I think the Park N Ride planned for there now will create some decent ridership levels.
I remember reading somewhere that the boarding/alighting volumes of the GO bus stops at York University already rank it up there with some of the middle-of-the-pack GO railway stations. If you assume that all the GO ridership will shift from the middle of York to this station on Day 1 of the subway being open (fare integration is presumably going to be a factor here) then you start with a pretty heavily-used transfer point from the get-go.
The technically-preferred alignment of the transitway is here, from the last round of PICs. Dunno if it changed at all between PIC#2 and the EA's completion. In the 'station concepts' document you can see the proposed interface with the subway station.From what I remember reading, I think that was the case. It would run on 1 side of the highway, occasionally flipping back and forth depending on what side the next station needs to be on. With stops so far apart, I don't think it'll be flipping back and forth that often.
TTC Open House
TTC Open House
TTC Open House
TTC Open House
TTC Open House
TTC Open House
TTC Open House
TTC Open House
TTC Open House
TTC Open House