News   Mar 28, 2024
 353     0 
News   Mar 28, 2024
 363     1 
News   Mar 28, 2024
 711     0 

RBC Centre (LEED Gold, CadFair, 41s, KPF/B+H/&Co.) COMPLETE

looking south from king st. near the Royal Alexandra Theatre

DSC05025.jpg
 
BA vs RBC

Kicking Bay-Adelaide's ass in terms of floor completion.

And so it should. RBC had a head start. Back when I took some pictures on April 22/07 RBC was basically at ground level whereas BA was still digging the foundation.

Besides I think Ellis-Don is the general contractor for both projects. I think BA has an occupancy date for the lower floors for Feb. 09 so I'm not sure this "race" is over yet.
 
Does anyone know when they will start on the large banking box? I was under the impression that it was going to be built simultaneously with the rest of the building, but from the looks of it, they are using the space for storage and cranes etc. - any info on this?

rbc.jpg

bharchitects-toronto
 
that's half of it, and there's rebar sticking out of the west side of the floor slabs, to which the other half of the podium will be attached.
 
^^Yeah that does look like the initial elements of the box, however, I was just curious to know why it hasn't been progressing along with the rest of the building? by the way thanks..

p5
 

Back
Top