Toronto Eglinton Salvation Army | 24.08m | 4s | Metrolinx | IBI Group

Is this supposed to also have an entrance to the Crosstown? It's not immediately apparent in the render where that would be.

It would be stupid and shortsighted not to have a station entrance through this building.

So, it is pretty much guaranteed that there will not be a station entrance.
 
Thanks to the thread bump, I now realize that the Assembly Hall on the 4th floor of this structure is meant to be multi-purpose and presumably semi-public.

In other words, the new building will have the capability to host event spaces.

This could become a good location for municipal staff (and whomever else) to host future community meetings and consultations in the Yonge+Eglinton area.
 
1580662000185.png
 
A tower crane has been install to start work on Crosstown ventilation shaft and other requirement. Work will proceed with the rebuilding of the church.
 

Back
Top