ShonTron
Moderator
Member Bio
- Joined
- Apr 24, 2007
- Messages
- 12,502
- Reaction score
- 9,385
- Location
- Ward 13 - Toronto Centre
Brampton Transit has released their planned service improvements for September 2009 (Warning: PDF 19MB)
Basically, no new routes planned, but some route re-alignments and general service increases. Most routes with weekend service will now have a 30 minute service minimum, even evenings and Sundays.
Route 2 is extended south to Derry Road, with a connection to the 407/Hurontario GO stop. Route 11 gets a rush-hour branch, 11A between Bramalea GO and Shoppers World, for a combined 4 minute service. The industrial routes (10, 20, 40) get late evening rush-hour service to provide afternoon/midnight shift change service.
And bike racks are now in operation as of today. http://brampton.ca/transit/bikeRide/home.tml
Basically, no new routes planned, but some route re-alignments and general service increases. Most routes with weekend service will now have a 30 minute service minimum, even evenings and Sundays.
Route 2 is extended south to Derry Road, with a connection to the 407/Hurontario GO stop. Route 11 gets a rush-hour branch, 11A between Bramalea GO and Shoppers World, for a combined 4 minute service. The industrial routes (10, 20, 40) get late evening rush-hour service to provide afternoon/midnight shift change service.
And bike racks are now in operation as of today. http://brampton.ca/transit/bikeRide/home.tml