You will be happy to know the 403 connection to/from 401 is underway with the 410 expansion.
I noticed in Jan going from 403 to 410 that excavation was taking place for the on ramp to 401 and widening of 410.
This past Friday, I noticed excavation is taking place north of Matheson Rd on the west side of 410 connection to 403 with construction poles all over the place.
On Sat going east on the 401, I noticed that the bridge over the north bound lanes of 410 had the 2nd section dug out under it to allow the 403 to 401 lane to be install under that bridge as well the widen 410.
The main work I expect at this time is to get the widening of 410 done first and then finish off the 403 ramps.
I noticed in Jan going from 403 to 410 that excavation was taking place for the on ramp to 401 and widening of 410.
This past Friday, I noticed excavation is taking place north of Matheson Rd on the west side of 410 connection to 403 with construction poles all over the place.
On Sat going east on the 401, I noticed that the bridge over the north bound lanes of 410 had the 2nd section dug out under it to allow the 403 to 401 lane to be install under that bridge as well the widen 410.
The main work I expect at this time is to get the widening of 410 done first and then finish off the 403 ramps.