dowlingm
Senior Member
The notion that Metrolinx take over some VIA runs is hampered by the fact that even if equipment could be found, as oft discussed on GO threads they certainly have crewing constraints. Bilevels might work but there might be questions about paying ViA fares for GO comfort.A good idea would be to start negotiating a lease with Metronlinx about leasing BI Levels and crews.
Exo also retired their 1989 Comet IIs in August, not sure whether they have anything left in them. I assume ONR don’t have enough suitable stock lying around to lease and make a dent in capacity constraints should things be as acute as posts above make it out.




