generalcanada
Senior Member
from reddit looks like one of the trains in the davisville yard derailed
New RSZ coming into effect shortly!from reddit looks like one of the trains in the davisville yard derailed
New RSZ coming into effect shortly!
The train is on a yard track, not the main line. There is no "northbound" or "southbound" here.Looks like a "picked switch" - tail end truck took the wrong route at a facing point switch, and the car tried to go down two routes at once.
- Paul
PS - Am I seeing this correctly - train is on the southbound track? To pick the switch, the train would have to be moving north. Hmm
How feasible would it be at this point to just cap the remaining ditched sections of Line 1?
Less frequent than that I think. Twice a decade maybe?50 cm of snow in a week is a lot, but it's something Toronto deals with every couple of years. You'd think the TTC could deal with it without having to close a big chunk of its line for two full days.
In order for that to happen, the switch would have to be flipped while the train is already passing over it, though. So either a malfunction caused the switch to activate on its own, or it was mistakenly activated at the wrong time.Looks like a "picked switch" - tail end truck took the wrong route at a facing point switch, and the car tried to go down two routes at once.
Cover the open air tracks with angled solar panels. The snow could slide off as the sun heats it and then power the trains.For sections that are fully below grade, so most of Davisville to Eglinton and Summerhill to Rosedale, very feasible......
Maybe even under active consideration.....
For Davisville to St. Clair, it would more complcated, same for Rosedale to Bloor. Not not do-able, but the relationships to grade are more of an issue than some other sections as noted.a
On the former, there is also the matter of the Yellow Creek tunnel running under there. While on the latter, Castle Frank Brook is in the mix somewhere.
****
For the trains in the median of The Allen, you could cover them, its not complicated, but you really need to decide what you want to do with Allen before thinking about that.
Line 2 doesn't have much open cut in ditches, it tends to be at or above grade for the most part.
In order for that to happen, the switch would have to be flipped while the train is already passing over it, though. So either a malfunction caused the switch to activate on its own, or it was mistakenly activated at the wrong time.
There is another possibility.In order for that to happen, the switch would have to be flipped while the train is already passing over it, though. So either a malfunction caused the switch to activate on its own, or it was mistakenly activated at the wrong time.




