Can't see 501 streetcars returning to Humber Loop or Long Branch until at least April or May at this time.
No idea what was to be done at Long Branch loop, but other than rebuilding the waiting area and new roof shingles, saw nothing at all. 4 buses parked waiting to go into service with one departing when I left.
All the overhead is 100% rebuilt up to Park Lawn.
Bike lanes with bump out transit stops has been built on the south side east of McD and not sure where it has stop that will see more work in the spring going east. High curb with large gaps between them have been built to keep traffic off the bikes lanes, but cars can get in these gaps areas easy.
Most of the Lake Shore is complete for the new tracks east of Park Lawn as well allowing traffic to go west of the underpass, but concrete is not pour for the rails west of the underpass for a block and no rails in the underpass.
All of the Queensway ROW is 100% done, with bracket support added to the support poles east of Windermere, but missing overhead as well power line. Poles and brackets are missing west of Windermere Ave to Humber Loop. Construction barriers on the Humber Bridge were being remove with only the eastbound ones to be remove. The last westbound barrier was being removed when I drove by.
The new substation is in place and being wired.
The power line tower in the loop area going east has been removed.
Looks like there is going to be a loop to loop where the old eastbound was or another bypass track going east, but not finish. They were working on the track going into the underpass, with a lot of missing tracks for the whole loop.
This video will show what has been done so far as of Jan 15