I’d suggest it’s the second part of this, rather than volume that really matters. It’s not about whether the volume is roughly equivalent, but whether that demand is meaningfully split at Eglinton. My suspicion is that, with a GO, Eglinton LRT and possibly OL connection at Mount Pleasant the actual amount of true through riders would be pretty limited. I’ll also say that the balance in my head shifts quite a bit if you CAN realistically bring surface running down to St. Clair…
Now, the other thing I’ll put out there in terms of raw musings is that if through running all the way IS needed Jane would be a very nice candidate for build out at TTC gauge (am I crazy or did Jane survive as TTC Gauge for some time after the bulk of Transit City had been changed to standard? I seem to recall that the EA had already been ‘paused’ by the time that happened, but that some documents put it in a bucket with Lakeshore to go TTC gauge if it were revived) and through running downtown through either a Queen tunnel or a lakeshore ROW.
With all that said, I’m really getting quite fond of RapidTO. A Jane rapid transit project of some sort should happen… but I’d really rather we focus on phased upgrades to the major bus corridors at a city wide level in the short term… at least until the obvious GO electrification, subway expansion, OL extension and 407/427 rapid transit projects are funded. And yes, I DO, with some real sadness with my foamer hat on, put the Eglinton East LRT in that category of ‘nice to have, should be protected for, but not a priority until the regional stuff is done’.