TransitPolicyChanger
Active Member
Converting Sheppard to SkyTrain and bridging over 404 (instead of tunnelling), and then elevating through Scarborough is another option - similar to Michael Schabas' plan.
Just wondering how would you ever be able to get that line above the 404 if it were converted? You mean rebuilding it entirely I assume and abandoning the existing station at Don Mills.