It makes sense as a Phase 1. But York Region is opposed to this, knowing that phase 2 could be deferred indefinitely.
Phase 2?
We have to remember that YRT/Viva induces demand by funneling all routes to Yonge, and therefore Viva Blue and Finch Station. This also has to do with how the TTC also has induced demand with Line 1 being the only North-South subway (rapid transit) line. Also, these ridership numbers do not take into account RER or region-wide Fare Integration, so the increase of riders on Barrie and Stouffville lines are not taken into account.
I'm not against the YNSE, nor am I trying to say that it's not justified, but I just want to point out that our transit system is too focused on Yonge being the "main" N-S "rapid" transit connection and RER will be a big part of changing that, as well as proper rapid transit on Jane and Don Mills/Leslie.
Once the first leg of the DRL is built, I hope that they add to it constantly. Phase 1 should bring both legs to Bloor, Phase 2 to EC, and Phase 3 should be Sheppard/YYZ.. Maybe Phase 4 should go to Unionville Go and into Brampton.
As I see it, the TBMs don't stop. Once they get to each phase, they put the infrastructure in and open it as soon as possible.