It looks like the cladding for the entire third floor will be mostly completed by the end of today.
As for the colour panels, I spoke to the sales office and was told they are an important element in the design and are going up as planned.
Which is good news as I think the subtle colours will really make this building standout, even more than it already will.
If you look closely, you can see that the colored panels have made an appearance. There seems to be a blue one on the front and a red on on the back.
wow its looking great and i think the coloured panels are gonna be the iceing on the cake for this one
Now that we know that the lobby is considered the first and second floor, the 4th floor cladding is now complete. They are prepping the concrete slabs so presuming the materials are on site, the 5th floor cladding should begin going up tomorrow. Finally, the 16th floor (not counting the 13th) is nearing completion.
Talk about efficient!