maestro
Senior Member
Phase 2 is the other half to this building that is currently occupied by the existing hospital.
I think it was like that upon installation. Perhaps a paintjob is still forthcoming.
[/IMG]
Photos taken 7 January
And what I assume is demolition to make way for phase 2.
I wonder if the parking lot next to the demolition is part of it. All of my parking spots are slowly being taken away. First Lumiere, then the Sick kids research tower and now hopefully not this one.