From Nov. 13;
Ground Floor looks like it has all been poured and most of the columns have been poured up to the Second Floor slab. Starting to see some formwork for the second floor slab in the South-East Corner of the site, with the North West Corner having the least progress so far.
PXL_20211113_165012298.jpg
PXL_20211113_165053141.jpg

PXL_20211113_165209160.jpg
 