innsertnamehere
Superstar
There should really be no escalators, and if there are any, just 1. besides, how long will they last when there are 300,000 people walking over them every day?
Last edited:
Webcast of the March 6 Engineering Innovation Forum - tons of info on the dig down, trainshed and Union subway station:
http://youtu.be/c4l7H25lm7w
Also here is a presentation on the dig down at the Fall 2012 American Concrete Institute Convention in Toronto:
http://www.concrete.org/education/Webcasts/PDFs/Saffarini.pdf
AoD
guste:
This forum shall not be held accountable for neglected relationships, etc. I haven't had time to really listen to the whole thing, just skimmed through bits and pieces of it. Find the dig down and Union Subway Station sections most interesting with the most info.
AoD
Webcast of the March 6 Engineering Innovation Forum - tons of info on the dig down, trainshed and Union subway station:
http://youtu.be/c4l7H25lm7w
Also here is a presentation on the dig down at the Fall 2012 American Concrete Institute Convention in Toronto:
http://www.concrete.org/education/Webcasts/PDFs/Saffarini.pdf
AoD
Does anyone know When the GO concourse is supposed to switch to the new York concourse for the Bay concourse to be built?
This October? Even if it is delayed that's sooner than I thought. I was thinking next October or something.