AlvinofDiaspar
Moderator
What if they'd made it look like this:
View attachment 306445
Source: https://www.archdaily.com/924171/adidas-world-of-sports-arena-behnisch-architekten
There is a closer example - CCBR at St. George Campus.
AoD
What if they'd made it look like this:
View attachment 306445
Source: https://www.archdaily.com/924171/adidas-world-of-sports-arena-behnisch-architekten
The Military Trail address refers to that given the entire site, not to the position of the building within the site. This happens at other multi-phase sites in the city like Regent Park, where all submissions are addressed to 325 Gerrard St E.Thanks.
Odd, if you go through the 3 applications all listed there, one gives the address as 1050 Military Trail, which is the same address given for the instructional centre.
For reference:
View attachment 306444
* of note, Under the application noted above, I can read the supporting docs, which are all coded as .txt files
I've left a message w/the planner to review this.
Construction work has also begun on Instruction Centre 2, which will house 24 classrooms – varying in capacity from 24 seats to 500 – and act as a student hub at U of T Scarborough that incorporates several student service departments. This building is scheduled to be completed in 2024.