Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

1629505746465.png

Source
 
Was walking by earlier this morning with my wife, and had this brief conversation:

Her: Should we stop so you can take a picture?

Me: I don't always need to stop and take photos of construction sites. Besides, a lot of other people are capturing this site.

*spots tempting new crane section on flatbed truck*

Me:
On second thought...

.................

Taken today:

PXL_20210912_133250933-01.jpeg


PXL_20210912_133254340-01.jpeg


PXL_20210912_133301342.MP-01.jpeg


PXL_20210912_133425175.MP.jpg


PXL_20210912_133417293.jpg
 
Was walking by earlier this morning with my wife, and had this brief conversation:

Her: Should we stop so you can take a picture?

Me: I don't always need to stop and take photos of construction sites. Besides, a lot of other people are capturing this site.

*spots tempting new crane section on flatbed truck*

Me:
On second thought...

.................

Taken today:

View attachment 348297

View attachment 348298

View attachment 348299

View attachment 348300

View attachment 348301

Bit early for brunch.........


But, good photo series, so glad you got out early!
 

Back
Top