News   Apr 23, 2024
 219     0 
News   Apr 22, 2024
 973     0 
News   Apr 22, 2024
 300     0 

Toronto Top Ten (by height) 1929-2014

I also have more faith in the under construction U-Condo-2, 55 storey/184 meter building sneaking in that list for 2013/2014 than that visionary Ontario government 44 storey/192 meter building at 880 Bay.
 
Yes, a lot of the SSP completion dates are unlikely to be met, but I decided to keep them rather then change the dates based on my subjective opinions. (With the exception of Skyline Tower, which has not even had its design revealed yet -- I bumped that one back a year.)
 
Yes, a lot of the SSP completion dates are unlikely to be met, but I decided to keep them rather then change the dates based on my subjective opinions. (With the exception of Skyline Tower, which has not even had its design revealed yet -- I bumped that one back a year.)

Right-on..you did a great job Mongo
 
I also have more faith in the under construction U-Condo-2, 55 storey/184 meter building sneaking in that list for 2013/2014 than that visionary Ontario government 44 storey/192 meter building at 880 Bay.

On consideration, I moved 880 Bay back a year to 2014 as well (to go along with the equally speculative Skyline Tower).

I wish that we knew what was going on with 45 Bay and the Cityplace signatuire tower, since 45 Bay at least would be likely to also be completed by 2015. Not needing a lengthy sales period before starting construction, it should be completed in a relatively short time (3 or 4 years?) once it has been publicly announced.
 
Last edited:
CTBUH info for TO Scrapers

CTBUH Status as of April 2011...(100m & taller) Sorted by Completion Date

Status** building name** meters** feet** floors** completed** material** use (top to bottom)

completed Royal York Hotel** 134** 440** 26** 1929** /** hotel
completed Commerce Court North** 145** 476** 34** 1931** steel** office
completed City Hall East Tower** 100** 327** 27** 1965** /** government
completed TD Tower** 223** 731** 56** 1967** steel** office
completed Simpson Tower** 144** 472** 33** 1968** /** office
completed Royal Trust Tower** 183** 600** 46** 1969** steel** office
completed Sheraton Centre Hotel** 135** 443** 43** 1972** concrete** hotel
completed Commerce Court West** 239** 784** 57** 1973** composite** office
completed 44 Charles Street West** 166** 545** 51** 1974** concrete** residential
completed Two Bloor West** 149** 489** 34** 1974** /** office
completed Two Bloor East** 134** 440** 34** 1974** concrete** office
completed First Bank Tower** 298** 978** 72** 1975** steel** office
completed Royal Bank Plaza South** 173** 568** 41** 1976** /** office
completed Palace Pier** 138** 453** 46** 1978** concrete** residential
completed Oxford Tower** 137** 449** 33** 1979** /** office
completed Cadillac Fairview Tower** 142** 466** 36** 1981** /** office
completed Exchange Tower** 146** 479** 30** 1983** / office
completed 79 Wellington Street West** 154** 504** 39** 1985** / office
completed Simcoe Place** 148** 486** 33** 1985** / office
completed Scotia Tower** 275** 902** 68** 1989** composite* office
completed BCE Place-Canada Trust * 261** 856** 53** 1990** composite** office
completed Bay-Wellington Tower** 207** 679** 49** 1991** composite** office
completed Palace Place** 138** 453** 46** 1991** concrete** residential
completed Ernst & Young Tower** 133** 436** 31** 1991** / office
completed The 250** 151** 494** 35** 1992** / office
completed Pantages Tower** 140** 459** 46** 2003** concrete** residential / hotel
completed 1 King West** 176** 578** 51** 2005** concrete** residential / hotel
completed 35 Mariner** 153** 503** 49** 2005** concrete** residential
completed Empire Tower** 130** 427** 28** 2005** concrete** residential
completed Res. of College Park I** 163** 535** 51** 2006** concrete** residential
completed West One** 148** 486** 49** 2007** concrete** residential
completed The Met** 146** 479** 43** 2007** concrete** residential
completed SP!RE** 143** 469** 45** 2007** concrete** residential
completed N1/N2** 133** 436** 41** 2007** concrete** residential
completed Quantum 2** 165** 541** 51** 2008** concrete** residential
completed Res. of College Park II** 147** 482** 45** 2008** concrete** residential
completed Verve** 126** 413** 39** 2008** concrete** residential
completed Bay-Adelaide West** 218** 715** 51** 2009** composite** office
completed RBC Centre** 185** 607** 42** 2009** concrete** office
completed Success Tower** 162** 531** 45** 2009** concrete** residential
completed Montage** 153** 502** 48** 2009** concrete** residential
completed Murano South Tower* * 140** 459** 41** 2009** concrete** residential
completed Telus Tower** 126** 413** 30** 2009** concrete** office
completed Accolade ** 110** 361** 36** 2009** concrete** residential
completed eq1 at Equinox** 110** 359** 35** 2009** concrete** residential
completed Maple Leaf Square N ** 186** 610** 54** 2010** concrete** residential / hotel
completed Maple Leaf Square S** 174** 571** 50** 2010** concrete** residential
completed X Condominium** 149** 487** 45** 2010** concrete** residential
completed CASA** 138** 453** 45** 2010** concrete** residential
completed Ritz-Carlton Toronto** 213** 699** 53** 2011** concrete** residential / hotel
U/C***** Four Seasons Private Res W** 190** 623** 55** 2011** concrete** residential / hotel
U/C***** The Uptown** 158** 518** 48** 2011** concrete** residential
topped** Festival Tower** 157** 514** 42** 2011** concrete** residential
U/C***** Burano** 153** 502** 48** 2011** concrete** residential
U/C***** Star Tower** 150** 493** 44** 2011** concrete** residential
U/C***** 33 Bay** 135** 443** 41** 2011** concrete** residential
U/C***** Trump Int. Hotel & Tower** 281** 922** 59** 2012** concrete** residential / hotel
U/C***** Living Shangri-La Toronto** 214** 702** 65** 2012** concrete** residential / hotel
U/C***** L Tower** 205** 673** 57** 2012** concrete** residential
proposed 50 St. Joseph Street Tower 2** 184** 604** 45** 2012** /** residential
proposed Bay-Adelaide Center E Tower** 180** 591** 43** 2012** / residential / office
proposed 300 Front** 157** 515** 50** 2012** / residential
proposed 50 St. Joseph Street Tower 1** 154** 505** 45** 2012** / residential
proposed Couture** 131** 430** 43** 2012** concrete** residential
U/C***** Ice Condos at York Centre 1** 186** 610** 55** 2013** / residential
U/C***** Aura at College Park** 266** 874** 75** 2014** concrete** residential
proposed Ice Condos at York Centre 2** 216** 710** 65** 2015** / residential
proposed 21 Avenue Tower 1** 175** 574** 58** 2015** / residential
proposed Number One Bloor** 220** 722** 65** ???? / residential
proposed Signature Tower** 218** 715** 69** ???? / residential
proposed 16 York St. Condo 1** 217** 712** 65** ???? / residential
proposed ROM Tower** 197** 646** 44** ???? /** multiple
proposed 16 York St. Condo 2** 186** 610** 55** ???? / residential
proposed Richmond-Adelaide Centre** 181** 594** 41** ???? /** -
proposed GWL Hotel Tower** 178** 584** 50** ???? /** residential / hotel
proposed 880 Bay** 175** 574** 39** ???? /** government
proposed Graphic Arts Tower** 172** 564** 55** ???? / residential
proposed Simcoe Place II** 168** 551** 40** ???? / office
proposed 151 Front Street West** 167** 548** 36** ???? / office
proposed Bay-Adelaide Center N Tower** 162** 531** 49** ???? /** multiple
proposed 16 York St. Office** 157** 515** 31** ???? / office
proposed Theatre Park** 157** 515** 47** ???? / residential

I have no idea why the ** are there, I lined each column up.
If any one has any info how to line things up, let me know please. :cool:
 
Last edited:

Back
Top