Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

5258EF03-6582-4C58-8200-A4999D3115EF.jpeg
 
That northeast crane must need to be made taller soon. Anyone have any intel on when that may be? I want to make sure the toddler can watch. He is making me make tower cranes out of Duplo recently, so he will think it's super cool.
 

Back
Top