Toronto Theatre District Residence & Riu Plaza Hotel | 156.05m | 49s | Plaza | BDP Quadrangle

Stopped by March 28th to take a couple pictures. Not much difference on the outside, other than that for the south building, they have finished the cladding (?) for the parts that used to be the hoist elevator.

IMG_6947.JPG
IMG_6948.JPG
IMG_6949.JPG
IMG_6950.JPG
 
From April 18 - The construction crane is still coming down. Compared to the times taken by other sites to bring down their construction cranes, this one seems to be quite slow. Meanwhile, the landscaping preparation for the areas in front of the townhouse units is underway. boulevard area in front of the townhouse unit is underway.

1000004116.jpg


20240418_135526.jpg


1000004118.jpg


1000004119.jpg
 

Back
Top