Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

Tuesday, May 25.

The office tower crane was working until 8:10 this evening. Two photos, one of the overall The Well site, and a second one focusing on the top floors office tower, and in particular the roof slab. What is material is what cannot now be seen. (Answer after the second photo, below.)

20210525_204234.jpg


20210525_204204.jpg


Answer: What cannot be seen is the rooftop components of the office tower concrete pump system - it's gone. The tower crane was busy bringing them down and loading them on a flatbed truck this evening.
 

Attachments

  • 20210523_135545.jpg
    20210523_135545.jpg
    105 KB · Views: 119
Last edited:

Back
Top