Toronto The Southwood | 24.69m | 6s | Streetcar | TACT Architecture

017edeb8d6689c8f708c24cdb09a951564163560cc_00001.jpg
 

Attachments

  • 017edeb8d6689c8f708c24cdb09a951564163560cc_00001.jpg
    017edeb8d6689c8f708c24cdb09a951564163560cc_00001.jpg
    968.8 KB · Views: 857
Yesterday:
P1080124.JPG
P1080125.JPG
P1080126.JPG
P1080127.JPG


Should this be merged into the Southwood thread?
 

Attachments

  • P1080124.JPG
    P1080124.JPG
    1.5 MB · Views: 747
  • P1080125.JPG
    P1080125.JPG
    1.4 MB · Views: 751
  • P1080126.JPG
    P1080126.JPG
    1.3 MB · Views: 767
  • P1080127.JPG
    P1080127.JPG
    1.4 MB · Views: 764
The two Southwood threads have been merged. The two phases are on either side of Kingston Road, a block or so apart.

42
 
  • Like
Reactions: PMT
This is Southwood Phase 2, on the north side of Kingston Road, curiously, much further through the construction process than Phase 1.

DSC08900.jpg

DSC08899.jpg

DSC08890.jpg


Heading down the lane along the east side of the building to the ravine on the north side is pretty interesting…

DSC08891.jpg

DSC08892.jpg

DSC08893.jpg

DSC08896.jpg


42
 

Attachments

  • DSC08890.jpg
    DSC08890.jpg
    376.3 KB · Views: 554
  • DSC08891.jpg
    DSC08891.jpg
    450.6 KB · Views: 569
  • DSC08892.jpg
    DSC08892.jpg
    416 KB · Views: 573
  • DSC08893.jpg
    DSC08893.jpg
    379.6 KB · Views: 606
  • DSC08896.jpg
    DSC08896.jpg
    485.9 KB · Views: 598
  • DSC08899.jpg
    DSC08899.jpg
    344.3 KB · Views: 583
  • DSC08900.jpg
    DSC08900.jpg
    344.4 KB · Views: 594
This is Southwood Phase 1, on the south side of Kingston Road at the top of Southwood Drive:

DSC08887.jpg

DSC08884.jpg

DSC08882.jpg


42
 

Attachments

  • DSC08882.jpg
    DSC08882.jpg
    255 KB · Views: 581
  • DSC08884.jpg
    DSC08884.jpg
    231.1 KB · Views: 570
  • DSC08887.jpg
    DSC08887.jpg
    269.5 KB · Views: 589
It looks like they they ran out of some discontinued brick and had to use some other cladding in a few spots.
 
The Hoarding will be coming down in the next week or two as they are just finishing up installing the ground floor windows. The Big Carrot Natural Food Market will be opening their second location here as the anchor tenant with a target opening date of late February 2018.
 
The two Southwoods from a couple days ago. One hardhatted construction worker outside Phase 1, then pictures 3 and 4 are Phase 2.

DSC05939.jpg
DSC05940.jpg
DSC05941.jpg
DSC05942.jpg


The hardhats at Phase 2 were installing Snow Route signs on the electrical pole outside the building, and not connected with construction there. It looks nearly fully lived in, whereas Phase 1 looks like occupancy's just starting.

42
 

Attachments

  • DSC05939.jpg
    DSC05939.jpg
    301.2 KB · Views: 584
  • DSC05940.jpg
    DSC05940.jpg
    292.1 KB · Views: 582
  • DSC05941.jpg
    DSC05941.jpg
    352.4 KB · Views: 582
  • DSC05942.jpg
    DSC05942.jpg
    321.4 KB · Views: 560

Back
Top